Naschitti Traffic and Road Conditions
×
Warning! Do not attempt to use any of these features while driving a vehicle.
Naschitti Traffic Map
No Traffic Flow? Choose Live Map then Zoom in Closer
How to use the Naschitti Traffic Map
Traffic flow lines: Red/White dashed lines = Closed Road, Grey/White dashed lines = Road Work, Red lines = Heavy traffic flow, Yellow/Orange lines = Medium flow and Green = normal traffic. Black lines or No traffic flow lines could indicate a closed road, but in most cases it means that either there is not enough vehicle flow to register or traffic isn't monitored. Also, If you do not see traffic flow, you can zoom in closer to reveal localized data. If you are unable to pan the map, press here (to focus off of the map) and try again.
Traffic Incidents (beta): Each image represents traffic event or incident such as road construction, closure (red circle with a white dash) or accident.
Traffic Alert
Tips
- Click or touch the map to move in different directions.
- If you do not see any markers on the map, try zooming in one or two levels using "+" on the top left side. However, they are not always available.
- Click an incident icon on the map to get more information.
FAQs
Q) How often is the map updated?
A) The traffic flow is updated at loadtime and upon movement outside the initial map view, or upon refresh of the page. Any incident markers are checked for updates approximately every 5-10 minutes, but you need to reload the page to load any new updates; the data provided may still be the same status/view as before. Information shown is as only reliable as how it is reported to us.
Q) The roads are backed up or closed, but the map does not show the reason why, what's the deal?A) Municipal traffic monitors or GPS trackers may not be available, could be offline, or reports and alerts are not syndicated to media outside of the area to use on the map. This is especially true for rural areas. You are encouraged to leave a road conditions report to help others.
Q) I see traffic alerts in the box below for the state, but they aren't related to the area I'm in? A) We attempt to display alerts as specific to the area as possible, however in some cases the data we receive will only allow us to provide it by county or even statewide.
Q) Are you an official source of traffic information? A) We are not an official source of traffic or real-time data. We have contracts and licenses to display certain up-to-date information that comes direct from some DOTs in various states, and the traffic flow on the maps is provided by Google, Mapbox or TomTom. However, the data shown here should only be used for light informational and reference purposes and not to make critical decisions. Your safest option on the web is to use your state-run traffic website, or to call the DOT traffic line for your state, local authorities, or the state's 511 number if available.
Naschitti Traffic Alerts
Title: Construction Closure, I 40 eastbound and westbound at mile marker 183, 11 miles west of Moriarity.
Description: I-40 MP 180-185 (Phased) There will be continuous lane and shoulder closures. Work is being performed for highway construction. Motorists should anticipate delays. Contractor: AUI Inc Project A302121 NMDOT: TBA
Post Date: 2024-07-31 11:41:57.0
Update Date: 2024-11-06 11:56:34.0
Expiration Date: 2024-12-31 23:59:00.0
Description: I-40 MP 180-185 (Phased) There will be continuous lane and shoulder closures. Work is being performed for highway construction. Motorists should anticipate delays. Contractor: AUI Inc Project A302121 NMDOT: TBA
Post Date: 2024-07-31 11:41:57.0
Update Date: 2024-11-06 11:56:34.0
Expiration Date: 2024-12-31 23:59:00.0
Title: Lane Closure, US 64 from mile marker 242, 12 miles west of Taos to mile marker 243, 11 miles west of Taos.
Description: Lane Closure~~~The New Mexico Department of Transportation, in conjunction with Ulteig Engineers, Inc., will begin performing a routine inspection of the Rio Grande Gorge Bridge beginning Friday October 25, 2024. *** Ulteig employees will be working 7 days a week, except holidays, during daylight hours. While they are working, the speed limit across the bridge will be reduced to 35 mph. One lane will be closed to traffic during working hours and a flagging operation will be in place to allow motorists to safely pass through the work zone. All traffic control devices will be removed at the end of the workday and the bridge reopened to traffic. *** The inspection is expected to be completed by December 31, 2024. *** Drivers are urged to watch out for workers in the area, observe traffic control signs and reduce speed to the posted speed limit.
Post Date: 2024-10-30 13:25:04.0
Update Date: 2024-10-30 13:25:04.0
Expiration Date: 2024-12-31 17:01:00.0
Description: Lane Closure~~~The New Mexico Department of Transportation, in conjunction with Ulteig Engineers, Inc., will begin performing a routine inspection of the Rio Grande Gorge Bridge beginning Friday October 25, 2024. *** Ulteig employees will be working 7 days a week, except holidays, during daylight hours. While they are working, the speed limit across the bridge will be reduced to 35 mph. One lane will be closed to traffic during working hours and a flagging operation will be in place to allow motorists to safely pass through the work zone. All traffic control devices will be removed at the end of the workday and the bridge reopened to traffic. *** The inspection is expected to be completed by December 31, 2024. *** Drivers are urged to watch out for workers in the area, observe traffic control signs and reduce speed to the posted speed limit.
Post Date: 2024-10-30 13:25:04.0
Update Date: 2024-10-30 13:25:04.0
Expiration Date: 2024-12-31 17:01:00.0
Title: Roadwork, I 10 from mile marker 140, Mesilla (NM 28/MESILLA) to mile marker 142, San Pablo (NM 478/MAIN ST.).
Description: Roadwork~~~La Calerita Construction, LLC. (Contractor) will be continuing a bridge rehabilitation project on I-10 over the University Ave Interchange, milepost 141. This project includes bridge rehabilitation, roadway reconstruction and lighting. Traffic has been shifted into the eastbound lanes with the westbound lanes and on/off ramp closed for bridge construction. The speed limit has been reduced to 45 MPH throughout the project. The contractor’s working hours are Monday through Friday from 7 a.m. to 5 p.m.
Post Date: 2024-09-25 05:26:40.0
Update Date: 2024-11-19 07:08:47.472
Expiration Date: unknown
Description: Roadwork~~~La Calerita Construction, LLC. (Contractor) will be continuing a bridge rehabilitation project on I-10 over the University Ave Interchange, milepost 141. This project includes bridge rehabilitation, roadway reconstruction and lighting. Traffic has been shifted into the eastbound lanes with the westbound lanes and on/off ramp closed for bridge construction. The speed limit has been reduced to 45 MPH throughout the project. The contractor’s working hours are Monday through Friday from 7 a.m. to 5 p.m.
Post Date: 2024-09-25 05:26:40.0
Update Date: 2024-11-19 07:08:47.472
Expiration Date: unknown
Title: Roadwork, I 40 eastbound and westbound from mile marker 255, 18 miles west of Santa Rosa to mile marker 263, (SAN IGNACIO). Left lane closed.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions.
Post Date: 2024-10-23 07:37:05.0
Update Date: 2024-10-23 07:37:05.0
Expiration Date: unknown
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions.
Post Date: 2024-10-23 07:37:05.0
Update Date: 2024-10-23 07:37:05.0
Expiration Date: unknown
Title: Alert, NM 159 from mile marker 4, 4 miles east of US 180 to mile marker 25, Willow Creek Campground.
Description: NM 159 from milepost 4 to milepost 25 (Willow Creek Campground). STEEP GRADES AND NUMEROUS TIGHT TURNS. Trucks without retarder brakes and/or longer than 46 feet in length are PROHIBITED on this section of NM 159. Trucks longer than 30 feet are highly encouraged to utilize a pilot vehicle. Consider using an alternate route - US 180 to NM 12 to NM 435 (NF-141). THIS IS A PERMANENT ALERT.~~~
Post Date: 2022-11-23 07:06:02.0
Update Date: 2024-11-14 07:00:39.0
Expiration Date: unknown
Description: NM 159 from milepost 4 to milepost 25 (Willow Creek Campground). STEEP GRADES AND NUMEROUS TIGHT TURNS. Trucks without retarder brakes and/or longer than 46 feet in length are PROHIBITED on this section of NM 159. Trucks longer than 30 feet are highly encouraged to utilize a pilot vehicle. Consider using an alternate route - US 180 to NM 12 to NM 435 (NF-141). THIS IS A PERMANENT ALERT.~~~
Post Date: 2022-11-23 07:06:02.0
Update Date: 2024-11-14 07:00:39.0
Expiration Date: unknown
Title: Roadwork, I 25 from mile marker 227, (Comanche) to mile marker 228, (MONTGOMERY).
Description: Roadwork~~~Roadwork, I-25 Improved, Comanche to Montgomery (MP 226-229) Drivers should anticipate lane reductions on I-25 and the local streets, and lane closures during off peak hours (outside of typical commute hours and weekends) In order to complete this large project on schedule, crews will be working day and night and up to seven days each week. I-25 travel lanes in the work zone will shift the median in August. Visit the project website at i25improved.com for more info. Call the team with questions at 505-785-7623 or email at info@I25improved.com Contractor: AUI Inc. Project Number: A301901 NMDOT: William Rose
Post Date: 2024-08-07 11:57:32.0
Update Date: 2024-08-07 12:04:16.0
Expiration Date: unknown
Description: Roadwork~~~Roadwork, I-25 Improved, Comanche to Montgomery (MP 226-229) Drivers should anticipate lane reductions on I-25 and the local streets, and lane closures during off peak hours (outside of typical commute hours and weekends) In order to complete this large project on schedule, crews will be working day and night and up to seven days each week. I-25 travel lanes in the work zone will shift the median in August. Visit the project website at i25improved.com for more info. Call the team with questions at 505-785-7623 or email at info@I25improved.com Contractor: AUI Inc. Project Number: A301901 NMDOT: William Rose
Post Date: 2024-08-07 11:57:32.0
Update Date: 2024-08-07 12:04:16.0
Expiration Date: unknown
Title: Difficult Driving, NM 4 from mile marker 0, San Ysidro to mile marker 46, 13 miles east of Sierra De los Pinos.
Description: Difficult Driving Conditions - Roads are snow packed and icy. Zero visibility due to blizzard conditions. Travel is discouraged.~~~Difficult driving conditions on NM 4, mile marker 0-46 (from US 550 at San Ysidro to the Los Alamos County Line). Road is snow packed and icy. Visibility is poor. Please drive with caution, reduce speed and obey all posted traffic signs. Watch for snowplows. This event will be updated as conditions change.
Post Date: 2024-11-06 20:42:58.0
Update Date: 2024-11-07 02:04:35.0
Expiration Date: unknown
Description: Difficult Driving Conditions - Roads are snow packed and icy. Zero visibility due to blizzard conditions. Travel is discouraged.~~~Difficult driving conditions on NM 4, mile marker 0-46 (from US 550 at San Ysidro to the Los Alamos County Line). Road is snow packed and icy. Visibility is poor. Please drive with caution, reduce speed and obey all posted traffic signs. Watch for snowplows. This event will be updated as conditions change.
Post Date: 2024-11-06 20:42:58.0
Update Date: 2024-11-07 02:04:35.0
Expiration Date: unknown
Title: Construction Closure, I 25 southbound at mile marker 236, 2 miles north of Albuquerque.
Description: I-25 MP 235-238 (thru 12/7) There will be southbound lane and shoulder restrictions . Work is being performed for interstate maintenance. Motorists should anticipate delays. Contractor: Uretek USA NMDOT: Barry Lytle
Post Date: 2024-11-06 11:55:03.0
Update Date: 2024-11-06 11:55:03.0
Expiration Date: 2024-12-07 23:59:00.0
Description: I-25 MP 235-238 (thru 12/7) There will be southbound lane and shoulder restrictions . Work is being performed for interstate maintenance. Motorists should anticipate delays. Contractor: Uretek USA NMDOT: Barry Lytle
Post Date: 2024-11-06 11:55:03.0
Update Date: 2024-11-06 11:55:03.0
Expiration Date: 2024-12-07 23:59:00.0
Title: Alert, NM 120 from mile marker 12, 5 miles west of Ocate to mile marker 3, 3 miles east of Black Lake. Roadway closed.
Description: Alert - Roads are snow packed and icy.~~~The roadway has limited width clearance. Tree cover will produce prolonged icy and snow-packed road conditions, only four-wheel drive vehicles are recommended.
Post Date: 2024-11-06 08:54:02.0
Update Date: 2024-11-06 08:54:02.0
Expiration Date: unknown
Description: Alert - Roads are snow packed and icy.~~~The roadway has limited width clearance. Tree cover will produce prolonged icy and snow-packed road conditions, only four-wheel drive vehicles are recommended.
Post Date: 2024-11-06 08:54:02.0
Update Date: 2024-11-06 08:54:02.0
Expiration Date: unknown
Title: Alert, Alert
Description: Alert~~~Low Clearance Structure, CMV's please use I-40 between exits 89 & 96. Height Restriction 13'6".
Post Date: 2024-06-05 10:26:04.0
Update Date: 2024-06-24 11:24:50.0
Expiration Date: unknown
Description: Alert~~~Low Clearance Structure, CMV's please use I-40 between exits 89 & 96. Height Restriction 13'6".
Post Date: 2024-06-05 10:26:04.0
Update Date: 2024-06-24 11:24:50.0
Expiration Date: unknown
Title: Roadwork, I 25 from mile marker 305, 21 miles north of Santa Fe to mile marker 309, 25 miles north of Santa Fe.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions along with a reduced speed throughout the construction zone.
Post Date: 2024-05-01 10:35:11.0
Update Date: 2024-08-30 07:16:49.0
Expiration Date: unknown
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions along with a reduced speed throughout the construction zone.
Post Date: 2024-05-01 10:35:11.0
Update Date: 2024-08-30 07:16:49.0
Expiration Date: unknown
Title: Roadwork, US 70 from mile marker 149, Las Cruces to mile marker 150, Las Cruces.
Description: Roadwork~~~El Terrero Construction, LLC. (Contractor) is continuing a project to make roadway improvements to US 70 North Main Street between Spitz/N. Solano Drive and the intersection of N. Triviz Drive/Elks Drive. All traffic has been placed on the new east bound lanes of US 70 (2 lanes open east bound and 1 lane open west bound) and the existing westbound lanes will be closed for construction. The speed limit is reduced to 35 miles per hour throughout the construction zone. For the safety of the traveling public, the Alameda Arroyo trail crossing remains CLOSED. Motorists are encouraged to use extra caution in the construction zone, obey lower posted speed limits and allow extra time to reach their destinations. Regular work hours are Monday-Friday 7 a.m.-5 p.m., although the contractor may work longer hours or on weekends if needed. Access will be maintained to all businesses and residences during construction. For more information or to sign up for construction updates, visit www.us70mainstreet.com.
Post Date: 2024-01-30 08:57:27.0
Update Date: 2024-11-19 07:08:47.472
Expiration Date: unknown
Description: Roadwork~~~El Terrero Construction, LLC. (Contractor) is continuing a project to make roadway improvements to US 70 North Main Street between Spitz/N. Solano Drive and the intersection of N. Triviz Drive/Elks Drive. All traffic has been placed on the new east bound lanes of US 70 (2 lanes open east bound and 1 lane open west bound) and the existing westbound lanes will be closed for construction. The speed limit is reduced to 35 miles per hour throughout the construction zone. For the safety of the traveling public, the Alameda Arroyo trail crossing remains CLOSED. Motorists are encouraged to use extra caution in the construction zone, obey lower posted speed limits and allow extra time to reach their destinations. Regular work hours are Monday-Friday 7 a.m.-5 p.m., although the contractor may work longer hours or on weekends if needed. Access will be maintained to all businesses and residences during construction. For more information or to sign up for construction updates, visit www.us70mainstreet.com.
Post Date: 2024-01-30 08:57:27.0
Update Date: 2024-11-19 07:08:47.472
Expiration Date: unknown
Title: Construction Closure, NM 1 westbound at mile marker 0, Elephant Butte.
Description: Construction Closure~~~NM 1 westbound lane at milepost 0 will be closed due to bridge repairs. Motorists are asked to reduce speed, obey posted signs, and be cautious of personnel and equipment in the areas listed below. These closures will remain in place until repairs can be made.
Post Date: 2024-10-29 17:45:01.0
Update Date: 2024-11-19 07:08:47.472
Expiration Date: unknown
Description: Construction Closure~~~NM 1 westbound lane at milepost 0 will be closed due to bridge repairs. Motorists are asked to reduce speed, obey posted signs, and be cautious of personnel and equipment in the areas listed below. These closures will remain in place until repairs can be made.
Post Date: 2024-10-29 17:45:01.0
Update Date: 2024-11-19 07:08:47.472
Expiration Date: unknown
Title: Lane Closure, I 25 northbound at mile marker 92, (MITCHELL POINT).
Description: Lane Closure~~~I-25 northbound driving lane will be closed at milepost 92(Mitchell Point) and NM 1 westbound lane at milepost 0 will be closed due to roadway repairs. Motorists are asked to reduce speed, obey posted signs, and be cautious of personnel and equipment in the areas listed below. These closures will remain in place until repairs can be made.
Post Date: 2024-10-29 17:44:21.0
Update Date: 2024-11-19 07:08:47.472
Expiration Date: unknown
Description: Lane Closure~~~I-25 northbound driving lane will be closed at milepost 92(Mitchell Point) and NM 1 westbound lane at milepost 0 will be closed due to roadway repairs. Motorists are asked to reduce speed, obey posted signs, and be cautious of personnel and equipment in the areas listed below. These closures will remain in place until repairs can be made.
Post Date: 2024-10-29 17:44:21.0
Update Date: 2024-11-19 07:08:47.472
Expiration Date: unknown
Title: Roadwork, US 64 from mile marker 273, 13 miles west of Eagle Nest to mile marker 276, 10 miles west of Eagle Nest. Left lane closed.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. A 10ft width and 55 length (bumper to bumper) restriction is in place for this phase of construction. Motorist can anticipate delays.
Post Date: 2024-06-25 11:01:43.0
Update Date: 2024-08-30 07:14:12.0
Expiration Date: unknown
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. A 10ft width and 55 length (bumper to bumper) restriction is in place for this phase of construction. Motorist can anticipate delays.
Post Date: 2024-06-25 11:01:43.0
Update Date: 2024-08-30 07:14:12.0
Expiration Date: unknown
Title: Roadwork, NM 39 from mile marker 14, 10 miles south of Gallegos to mile marker 19, 5 miles south of Gallegos. Left lane and left shoulder closed.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Speed has been reduced to 40 mph. Motorists can anticipate minor delays.
Post Date: 2024-10-22 09:57:25.0
Update Date: 2024-10-22 09:57:25.0
Expiration Date: unknown
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Speed has been reduced to 40 mph. Motorists can anticipate minor delays.
Post Date: 2024-10-22 09:57:25.0
Update Date: 2024-10-22 09:57:25.0
Expiration Date: unknown
Title: Conditions exist in the Taos area.
Description: Please Select~~~Crews are out salting and sanding. Drive with caution. Please stay behind snowplows at least 50 feet.
Post Date: 2022-02-22 12:16:48.0
Update Date: 2022-02-22 18:28:52.0
Expiration Date: unknown
Description: Please Select~~~Crews are out salting and sanding. Drive with caution. Please stay behind snowplows at least 50 feet.
Post Date: 2022-02-22 12:16:48.0
Update Date: 2022-02-22 18:28:52.0
Expiration Date: unknown
Title: undefined, US 64 from mile marker 266, 12 miles east of Taos to mile marker 272, 14 miles west of Eagle Nest.
Description: Please Select~~~
Post Date: 2022-02-22 05:18:04.0
Update Date: 2022-02-22 19:43:56.0
Expiration Date: unknown
Description: Please Select~~~
Post Date: 2022-02-22 05:18:04.0
Update Date: 2022-02-22 19:43:56.0
Expiration Date: unknown
Title: Construction Closure, I 25 northbound at mile marker 147, (SOCORRO SOUTH).
Description: Construction Closure~~~I-25 northbound on/off ramp will be closed at milepost 147 (Socorro south) for guardrail barrier and milling operations by the contractor. Motorists are asked to reduce speed, obey posted signs, and be cautious of personnel and equipment in the area. This closure will be lifted at approximately 4 p.m.
Post Date: 2024-11-19 10:16:58.0
Update Date: 2024-11-19 10:16:58.0
Expiration Date: Tue Nov 19 16:00:00 MST 2024
Description: Construction Closure~~~I-25 northbound on/off ramp will be closed at milepost 147 (Socorro south) for guardrail barrier and milling operations by the contractor. Motorists are asked to reduce speed, obey posted signs, and be cautious of personnel and equipment in the area. This closure will be lifted at approximately 4 p.m.
Post Date: 2024-11-19 10:16:58.0
Update Date: 2024-11-19 10:16:58.0
Expiration Date: Tue Nov 19 16:00:00 MST 2024
Title: Lane Closure, I 10 westbound from mile marker 49, (NM 146/HACHITA) to mile marker 47, 22 miles east of Lordsburg.
Description: Lane Closure~~~I-10 westbound from milepost 49 to milepost 47 the passing and driving lane will be closed intermittently due to road maintenance. Motorists are asked to reduce speed, obey posted signs, and be cautious of personnel and equipment in the area. Please be sure to expect delays. The closure will be lifted at approximately 5:30 p.m.
Post Date: 2024-11-19 08:16:42.0
Update Date: 2024-11-19 08:16:42.0
Expiration Date: Tue Nov 19 17:30:00 MST 2024
Description: Lane Closure~~~I-10 westbound from milepost 49 to milepost 47 the passing and driving lane will be closed intermittently due to road maintenance. Motorists are asked to reduce speed, obey posted signs, and be cautious of personnel and equipment in the area. Please be sure to expect delays. The closure will be lifted at approximately 5:30 p.m.
Post Date: 2024-11-19 08:16:42.0
Update Date: 2024-11-19 08:16:42.0
Expiration Date: Tue Nov 19 17:30:00 MST 2024
Title: Roadwork, US 54 from mile marker 151, 19 miles south of Corona to mile marker 163, 7 miles south of Corona.
Description: Roadwork~~~New Roadway construction to include drainage structures is underway between MP 151.6 and MP 163.7 (south of Corona) on US 54. Motorists should obey all construction signing and watch for construction personnel and equipment in the area. Speed limit has been reduced to 45 MPH in the construction zone. Lanes are to remain open for traffic during this phase of the project. Project is scheduled to be finished in Fall of 2024. NMDOT Project Manager, Arron Clark (575)626-9817; Contractor, FNF Construction Inc., Project Manager, Rob Woods (602) 989-1692; Traffic Control Supervisor, David Hernandez (575) 800-4663.
Post Date: 2023-04-18 12:53:43.0
Update Date: 2024-07-12 10:30:03.0
Expiration Date: unknown
Description: Roadwork~~~New Roadway construction to include drainage structures is underway between MP 151.6 and MP 163.7 (south of Corona) on US 54. Motorists should obey all construction signing and watch for construction personnel and equipment in the area. Speed limit has been reduced to 45 MPH in the construction zone. Lanes are to remain open for traffic during this phase of the project. Project is scheduled to be finished in Fall of 2024. NMDOT Project Manager, Arron Clark (575)626-9817; Contractor, FNF Construction Inc., Project Manager, Rob Woods (602) 989-1692; Traffic Control Supervisor, David Hernandez (575) 800-4663.
Post Date: 2023-04-18 12:53:43.0
Update Date: 2024-07-12 10:30:03.0
Expiration Date: unknown
Title: Roadwork, NM 68 from mile marker 4, 3 miles south of Alcalde to mile marker 12, 2 miles south of Velarde.
Description: Roadwork~~~There will be intermittent lane closures and traffic switches during this time as construction progresses. This project is scheduled for completion in the fall of 2024. Please obey all traffic control personnel and proceed with caution through the roadwork zone. Expect delays and use caution while travelling through the area.
Post Date: 2020-09-15 10:02:28.0
Update Date: 2024-03-04 14:19:27.0
Expiration Date: unknown
Description: Roadwork~~~There will be intermittent lane closures and traffic switches during this time as construction progresses. This project is scheduled for completion in the fall of 2024. Please obey all traffic control personnel and proceed with caution through the roadwork zone. Expect delays and use caution while travelling through the area.
Post Date: 2020-09-15 10:02:28.0
Update Date: 2024-03-04 14:19:27.0
Expiration Date: unknown
Title: Roadwork, US 180 from mile marker 123, Bayard to mile marker 128, 1 mile east of Hurley.
Description: Roadwork~~~Mountain States Constructors, Inc., is pleased to announce an upcoming project on US 180. This initiative will involve roadway reconstruction, rehabilitation, signal upgrades, lighting improvements, and Intelligent Transportation Systems (ITS) from milepost 123.13 in Bayard to milepost 128.27 in Hurley. Starting Monday, November 11, 2024, drivers should anticipate daytime lane closures in both the eastbound and westbound lanes as necessary. The contractor’s sequence of construction will be the area of the railroad track, westbound lanes then into the eastbound lanes. Work hours will be from 7 a.m. to 5 p.m., Monday through Friday. This reconstruction project is expected to take just over a year to complete, depending on weather conditions.
Post Date: 2024-11-12 07:05:08.0
Update Date: 2024-11-19 07:08:47.472
Expiration Date: unknown
Description: Roadwork~~~Mountain States Constructors, Inc., is pleased to announce an upcoming project on US 180. This initiative will involve roadway reconstruction, rehabilitation, signal upgrades, lighting improvements, and Intelligent Transportation Systems (ITS) from milepost 123.13 in Bayard to milepost 128.27 in Hurley. Starting Monday, November 11, 2024, drivers should anticipate daytime lane closures in both the eastbound and westbound lanes as necessary. The contractor’s sequence of construction will be the area of the railroad track, westbound lanes then into the eastbound lanes. Work hours will be from 7 a.m. to 5 p.m., Monday through Friday. This reconstruction project is expected to take just over a year to complete, depending on weather conditions.
Post Date: 2024-11-12 07:05:08.0
Update Date: 2024-11-19 07:08:47.472
Expiration Date: unknown
Title: Roadwork, NM 434 from mile marker 21, 5 miles south of Black Lake to mile marker 24, 2 miles south of Black Lake.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions along with a reduced speed throughout the construction zone. A 10ft width and 55ft length restriction is in place for this project.
Post Date: 2024-05-07 07:42:17.0
Update Date: 2024-08-30 07:16:08.0
Expiration Date: unknown
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions along with a reduced speed throughout the construction zone. A 10ft width and 55ft length restriction is in place for this project.
Post Date: 2024-05-07 07:42:17.0
Update Date: 2024-08-30 07:16:08.0
Expiration Date: unknown
Title: Roadwork, I 25 from mile marker 454, Raton to mile marker 460, (RATON PASS/PORT OF ENTRY).
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. A 12 ft. width restriction is in place and speed has been reduced to 55 mph. Motorists can anticipate minor delays.
Post Date: 2024-05-07 07:37:27.0
Update Date: 2024-10-22 09:59:18.0
Expiration Date: unknown
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. A 12 ft. width restriction is in place and speed has been reduced to 55 mph. Motorists can anticipate minor delays.
Post Date: 2024-05-07 07:37:27.0
Update Date: 2024-10-22 09:59:18.0
Expiration Date: unknown
Title: Alert, NM 42 from mile marker 0 , Corona to mile marker 35 , Willard.
Description: Alert~~~N.M. 42 will be closed intermittently to allow vehicles carrying wind turbine blades to safely access the roadway. Expect delays and use caution while travelling through the area.
Post Date: 2024-08-06 07:34:33.0
Update Date: 2024-08-06 07:34:33.0
Expiration Date: unknown
Description: Alert~~~N.M. 42 will be closed intermittently to allow vehicles carrying wind turbine blades to safely access the roadway. Expect delays and use caution while travelling through the area.
Post Date: 2024-08-06 07:34:33.0
Update Date: 2024-08-06 07:34:33.0
Expiration Date: unknown
Title: Roadwork, NM 18 at mile marker 32, Eunice.
Description: Roadwork~~~The New Mexico Department of Transportation District Two office in cooperation with Great Basin Industrial will begin railroad crossing rehabilitation on Tuesday, November 5, 2024 on NM 18 at milepost 32 (Eunice). The hours of operation are 7:00 a.m. to 5:00 p.m., Monday through Friday. Estimated completion is February 2025, weather permitting. Drivers can expect lane closures of both northbound and southbound lanes throughout the duration of the project. Drivers are encouraged to plan accordingly and expect some delays as traffic patterns shift during the rehabilitation phases.
Post Date: Tue Nov 05 07:52:06 MST 2024
Update Date: 2024-11-19 09:18:30.0
Expiration Date: unknown
Description: Roadwork~~~The New Mexico Department of Transportation District Two office in cooperation with Great Basin Industrial will begin railroad crossing rehabilitation on Tuesday, November 5, 2024 on NM 18 at milepost 32 (Eunice). The hours of operation are 7:00 a.m. to 5:00 p.m., Monday through Friday. Estimated completion is February 2025, weather permitting. Drivers can expect lane closures of both northbound and southbound lanes throughout the duration of the project. Drivers are encouraged to plan accordingly and expect some delays as traffic patterns shift during the rehabilitation phases.
Post Date: Tue Nov 05 07:52:06 MST 2024
Update Date: 2024-11-19 09:18:30.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 16, Malaga to mile marker 17, 1 mile north of Malaga. Left lane and left shoulder closed.
Description: Roadwork~~~Roadwork~~Roadway and Bridge Replacement Construction is underway on US 285 between MP 16.390 to MP 17.757. Motorists can expect a one lane closure with pilot car. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. The Maximum Posted Speed Limit during construction will be 45 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. This Project is 450 working days. Expected completion date is to be determined at a future date. Be aware of multiple construction operations taking place throughout the construction corridor. Contractor: Constructors Inc- Superintendent, Jose Louis Samaniega (915) 262-7475; Traffic Control Supervisor- Francisco Rodriguez (915) 540-2938; NMDOT Project Manager- Juan Salas 575-626-9882
Post Date: 2022-03-31 08:38:54.0
Update Date: 2023-08-01 12:03:57.0
Expiration Date: unknown
Description: Roadwork~~~Roadwork~~Roadway and Bridge Replacement Construction is underway on US 285 between MP 16.390 to MP 17.757. Motorists can expect a one lane closure with pilot car. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. The Maximum Posted Speed Limit during construction will be 45 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. This Project is 450 working days. Expected completion date is to be determined at a future date. Be aware of multiple construction operations taking place throughout the construction corridor. Contractor: Constructors Inc- Superintendent, Jose Louis Samaniega (915) 262-7475; Traffic Control Supervisor- Francisco Rodriguez (915) 540-2938; NMDOT Project Manager- Juan Salas 575-626-9882
Post Date: 2022-03-31 08:38:54.0
Update Date: 2023-08-01 12:03:57.0
Expiration Date: unknown
Title: Construction Closure, NM 109 northbound and southbound at mile marker 5, 1 mile north of Jarales.
Description: NM 109 MP 5.7 (thru 11/30) The New Mexico Department of Transportation will have a continuous road closure of the highway. Detours will be established. Work is being performed for bridge and road construction. Motorists should anticipate delays. Contractor: FNF Project A302220 NMDOT: NetoRey Terrazas
Post Date: 2024-03-28 10:58:59.0
Update Date: 2024-11-06 12:01:56.0
Expiration Date: 2024-11-30 23:59:00.0
Description: NM 109 MP 5.7 (thru 11/30) The New Mexico Department of Transportation will have a continuous road closure of the highway. Detours will be established. Work is being performed for bridge and road construction. Motorists should anticipate delays. Contractor: FNF Project A302220 NMDOT: NetoRey Terrazas
Post Date: 2024-03-28 10:58:59.0
Update Date: 2024-11-06 12:01:56.0
Expiration Date: 2024-11-30 23:59:00.0
Title: Construction Closure, NM 14 northbound and southbound and eastbound and westbound at mile marker 6, Sandia Crest Rd..
Description: NM 14, Crest Rd, Frost Rd MP 6 (Phased) There will be continuous lane and shoulder closures. Work is being performed for highway construction. Motorists should anticipate delays. Contractor: Star Paving NMDOT: Jeremy Maestas
Post Date: 2024-03-28 10:48:46.0
Update Date: 2024-11-06 11:57:21.0
Expiration Date: 2025-01-20 23:59:00.0
Description: NM 14, Crest Rd, Frost Rd MP 6 (Phased) There will be continuous lane and shoulder closures. Work is being performed for highway construction. Motorists should anticipate delays. Contractor: Star Paving NMDOT: Jeremy Maestas
Post Date: 2024-03-28 10:48:46.0
Update Date: 2024-11-06 11:57:21.0
Expiration Date: 2025-01-20 23:59:00.0
Title: Roadwork, US 60 northbound and southbound from mile marker 186, 5 miles east of Cannon AFB to mile marker 188, 7 miles east of Cannon AFB.
Description: Roadwork~~~The NMDOT and FNF Construction will begin a bridge replacement project on U.S. 60 south of Mountainair on April 24, 2023. The project will be in Socorro County between mile post 186.92 and 187.73. Motorists traveling on this section of US 60 should expect delays and allow extra time to reach their destinations. They should also use extreme caution in the construction zone and obey any posted speed limits.
Post Date: 2024-07-18 12:53:53.0
Update Date: 2024-11-19 07:08:47.472
Expiration Date: unknown
Description: Roadwork~~~The NMDOT and FNF Construction will begin a bridge replacement project on U.S. 60 south of Mountainair on April 24, 2023. The project will be in Socorro County between mile post 186.92 and 187.73. Motorists traveling on this section of US 60 should expect delays and allow extra time to reach their destinations. They should also use extreme caution in the construction zone and obey any posted speed limits.
Post Date: 2024-07-18 12:53:53.0
Update Date: 2024-11-19 07:08:47.472
Expiration Date: unknown
Title: Lane Closure, US 491 from mile marker 62, 5 miles north of Newcomb to mile marker 59, 2 miles north of Newcomb.
Description: Lane Closure~~~Southbound right lane closed on US 491, mile marker 62-59 (Newcomb) due to road maintenance. Speed is reduced to 55 mph in work zone. Please drive with caution, reduce speed, and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2024-11-14 17:20:19.0
Update Date: 2024-11-15 15:33:42.0
Expiration Date: 2099-12-31 17:00:00.0
Description: Lane Closure~~~Southbound right lane closed on US 491, mile marker 62-59 (Newcomb) due to road maintenance. Speed is reduced to 55 mph in work zone. Please drive with caution, reduce speed, and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2024-11-14 17:20:19.0
Update Date: 2024-11-15 15:33:42.0
Expiration Date: 2099-12-31 17:00:00.0
Title: Alert, I 25 northbound from mile marker 455, (RATON NORTH) to mile marker 460, (RATON PASS/PORT OF ENTRY).
Description: Alert - Roads are wet and may become slick.~~~Caution Potholes Ahead, Lane closures in place to allow road crews to repair pavement.
Post Date: 2024-11-14 08:45:44.0
Update Date: 2024-11-14 08:45:44.0
Expiration Date: unknown
Description: Alert - Roads are wet and may become slick.~~~Caution Potholes Ahead, Lane closures in place to allow road crews to repair pavement.
Post Date: 2024-11-14 08:45:44.0
Update Date: 2024-11-14 08:45:44.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 17, 1 mile north of Malaga to mile marker 21, Loving.
Description: Roadwork~~~Roadwork Construction is underway on US 285 between MP 17.386 to MP 21.974. Motorists can expect a one lane closure with pilot car. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. The Maximum Posted Speed Limit during construction will be 45 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. This Project is 450 working days. Expected completion date is to be determined at a future date. Be aware of multiple construction operations taking place throughout the construction corridor. Contractor: Constructors Inc- Superintendent, Jose Louis Samaniega (915) 262-7475; Traffic Control Supervisor- Francisco Rodriguez (915) 540-2938; NMDOT Project Manager- Brian Torres 575-626-4278.
Post Date: 2020-08-13 14:57:21.0
Update Date: 2024-07-12 10:41:28.0
Expiration Date: unknown
Description: Roadwork~~~Roadwork Construction is underway on US 285 between MP 17.386 to MP 21.974. Motorists can expect a one lane closure with pilot car. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. The Maximum Posted Speed Limit during construction will be 45 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. This Project is 450 working days. Expected completion date is to be determined at a future date. Be aware of multiple construction operations taking place throughout the construction corridor. Contractor: Constructors Inc- Superintendent, Jose Louis Samaniega (915) 262-7475; Traffic Control Supervisor- Francisco Rodriguez (915) 540-2938; NMDOT Project Manager- Brian Torres 575-626-4278.
Post Date: 2020-08-13 14:57:21.0
Update Date: 2024-07-12 10:41:28.0
Expiration Date: unknown
Title: Alert, NM 104 from mile marker 70, 1 mile east of Mesa Rica to mile marker 90, 15 miles east of Conchas.
Description: Alert~~~Bridge NO. 5995 at mile marker 71.5, Bridge No. 5254 at mile marker 81.8 and Bridge No. 5257 at mile marker 87.2 all have weight restrictions of 25 tons. Please seek alternate route.
Post Date: 2024-01-11 10:09:46.0
Update Date: 2024-11-14 08:48:17.0
Expiration Date: unknown
Description: Alert~~~Bridge NO. 5995 at mile marker 71.5, Bridge No. 5254 at mile marker 81.8 and Bridge No. 5257 at mile marker 87.2 all have weight restrictions of 25 tons. Please seek alternate route.
Post Date: 2024-01-11 10:09:46.0
Update Date: 2024-11-14 08:48:17.0
Expiration Date: unknown
Title: Construction Closure, NM 500 eastbound and westbound at mile marker 2.
Description: NM 500 EB & WB MP 10-11 Diversion Channal to 2nd St (thru 1/31/25) There will be various shoulder and lane restrictions. Work is being performed for highway construction. Motorists should anticipate delays. Contractor: H.O Construction Project A300945 Bernalillo County
Post Date: 2024-05-09 18:01:05.0
Update Date: 2024-11-06 11:58:44.0
Expiration Date: 2025-01-31 23:59:00.0
Description: NM 500 EB & WB MP 10-11 Diversion Channal to 2nd St (thru 1/31/25) There will be various shoulder and lane restrictions. Work is being performed for highway construction. Motorists should anticipate delays. Contractor: H.O Construction Project A300945 Bernalillo County
Post Date: 2024-05-09 18:01:05.0
Update Date: 2024-11-06 11:58:44.0
Expiration Date: 2025-01-31 23:59:00.0
Title: Roadwork, US 64 from mile marker 323, 13 miles west of Raton to mile marker 330, 16 miles west of Raton. Left lane closed.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Speed has been reduced and motorists can anticipate minor delays.
Post Date: 2024-08-08 08:52:25.0
Update Date: 2024-10-22 09:59:50.0
Expiration Date: unknown
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Speed has been reduced and motorists can anticipate minor delays.
Post Date: 2024-08-08 08:52:25.0
Update Date: 2024-10-22 09:59:50.0
Expiration Date: unknown
Title: Difficult Driving, NM 134 from mile marker 0, Sheep Springs to mile marker 22 , 4 miles south of Crystal.
Description: Difficult Driving Conditions - Snow and blowing snow are reducing visibility.~~~Difficult Driving Conditions NM 134, mile marker 0-22 (Sheep Springs to Crystal). Road is snow packed and icy. Visibility is fair. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2024-11-07 07:23:22.0
Update Date: 2024-11-08 05:46:21.0
Expiration Date: unknown
Description: Difficult Driving Conditions - Snow and blowing snow are reducing visibility.~~~Difficult Driving Conditions NM 134, mile marker 0-22 (Sheep Springs to Crystal). Road is snow packed and icy. Visibility is fair. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2024-11-07 07:23:22.0
Update Date: 2024-11-08 05:46:21.0
Expiration Date: unknown
Title: Difficult Driving, NM 485 from mile marker 0 to mile marker 3.
Description: Difficult Driving Conditions - Roads are snow packed and icy. Snow may cause limited visibility.~~~Difficult driving conditions on NM 485, mile marker 0-3 (from NM 4 to Gilman). Road is snow packed and icy. Visibility is poor. Please drive with caution, reduce speed and obey all posted traffic signs. Watch for snowplows. This event will be updated as conditions change.
Post Date: 2024-11-07 02:06:46.0
Update Date: 2024-11-07 02:06:46.0
Expiration Date: unknown
Description: Difficult Driving Conditions - Roads are snow packed and icy. Snow may cause limited visibility.~~~Difficult driving conditions on NM 485, mile marker 0-3 (from NM 4 to Gilman). Road is snow packed and icy. Visibility is poor. Please drive with caution, reduce speed and obey all posted traffic signs. Watch for snowplows. This event will be updated as conditions change.
Post Date: 2024-11-07 02:06:46.0
Update Date: 2024-11-07 02:06:46.0
Expiration Date: unknown
Title: Difficult Driving, NM 290 from mile marker 0 to mile marker 6.
Description: Difficult Driving Conditions - Roads are snow packed and icy. Snow may cause limited visibility.~~~Difficult driving conditions on NM 290, mile marker 0-6 (from NM 4 to Ponderosa). Road is snow packed and icy. Visibility is fair. Please drive with caution, reduce speed and obey all posted traffic signs. Watch for snowplows. This event will be updated as conditions change.
Post Date: 2024-11-07 02:05:16.0
Update Date: 2024-11-07 02:05:59.0
Expiration Date: unknown
Description: Difficult Driving Conditions - Roads are snow packed and icy. Snow may cause limited visibility.~~~Difficult driving conditions on NM 290, mile marker 0-6 (from NM 4 to Ponderosa). Road is snow packed and icy. Visibility is fair. Please drive with caution, reduce speed and obey all posted traffic signs. Watch for snowplows. This event will be updated as conditions change.
Post Date: 2024-11-07 02:05:16.0
Update Date: 2024-11-07 02:05:59.0
Expiration Date: unknown
Title: Roadwork, I 40 from mile marker 344, 8 miles east of Tucumacari to mile marker 350, 14 miles east of Tucumacari.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Speed has been reduced and motorists can anticipate minor delays.
Post Date: 2024-06-06 07:27:00.0
Update Date: 2024-08-30 07:14:32.0
Expiration Date: unknown
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Speed has been reduced and motorists can anticipate minor delays.
Post Date: 2024-06-06 07:27:00.0
Update Date: 2024-08-30 07:14:32.0
Expiration Date: unknown
Title: Lane Closure, NM 502 westbound from mile marker 12, 3 miles east of El Rancho to mile marker 13, 2 miles east of El Rancho.
Description: Lane Closure~~~The right lane will be closed from 7:30a.m. until 5p.m., Monday through Thursday, while utility contractors work in the shoulder area. All traffic control devices will be removed at the end of the workday and the lane reopened to motorists. Please obey all traffic control personnel and proceed with caution through the roadwork zone. Expect delays and use caution while travelling through the area.
Post Date: 2024-11-03 16:54:33.0
Update Date: 2024-11-03 16:54:33.0
Expiration Date: unknown
Description: Lane Closure~~~The right lane will be closed from 7:30a.m. until 5p.m., Monday through Thursday, while utility contractors work in the shoulder area. All traffic control devices will be removed at the end of the workday and the lane reopened to motorists. Please obey all traffic control personnel and proceed with caution through the roadwork zone. Expect delays and use caution while travelling through the area.
Post Date: 2024-11-03 16:54:33.0
Update Date: 2024-11-03 16:54:33.0
Expiration Date: unknown
Title: Roadwork, NM 129 at mile marker 0, Newkirk.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Speed has been reduced and motorists can anticipate minor delays.
Post Date: 2024-09-30 08:08:14.0
Update Date: 2024-09-30 08:08:14.0
Expiration Date: unknown
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Speed has been reduced and motorists can anticipate minor delays.
Post Date: 2024-09-30 08:08:14.0
Update Date: 2024-09-30 08:08:14.0
Expiration Date: unknown
Title: Roadwork, US 64 from mile marker 387, 38 miles east of Raton to mile marker 393 Sofia.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Speed has been reduced and motorists can anticipate minor delays.
Post Date: 2024-09-30 08:05:33.0
Update Date: 2024-09-30 08:05:33.0
Expiration Date: unknown
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Speed has been reduced and motorists can anticipate minor delays.
Post Date: 2024-09-30 08:05:33.0
Update Date: 2024-09-30 08:05:33.0
Expiration Date: unknown
Title: Roadwork, NM 28 from mile marker 27, 1 mile north of San Pablo to mile marker 29, 1 mile north of Mesilla.
Description: Roadwork~~~Mountain States Constructors (Contractor) will be continuing a nighttime milling and paving operation along NM 28, known as "Avenida de Mesilla," spanning from Watson Lane to Stern Drive. This operation may cause intermitted delays. Drivers should anticipate closures of shoulders and side streets to facilitate the removal and replacement of pavement. The contractor will operate from 6 p.m. to 7 a.m., and subject to weather conditions. Detour signs will guide motorists around side street closures, which will occur primarily during working hours and will be lifted during the day.
Post Date: 2024-09-30 07:18:18.0
Update Date: 2024-11-19 07:08:47.472
Expiration Date: unknown
Description: Roadwork~~~Mountain States Constructors (Contractor) will be continuing a nighttime milling and paving operation along NM 28, known as "Avenida de Mesilla," spanning from Watson Lane to Stern Drive. This operation may cause intermitted delays. Drivers should anticipate closures of shoulders and side streets to facilitate the removal and replacement of pavement. The contractor will operate from 6 p.m. to 7 a.m., and subject to weather conditions. Detour signs will guide motorists around side street closures, which will occur primarily during working hours and will be lifted during the day.
Post Date: 2024-09-30 07:18:18.0
Update Date: 2024-11-19 07:08:47.472
Expiration Date: unknown
Title: Alert, I 10 at mile marker 61, 20 miles west of Deming.
Description: Alert~~~Th Gage Rest Area is closed due to no water available. This closure will be in place until 2025.
Post Date: 2024-10-28 10:01:43.0
Update Date: 2024-11-19 07:08:47.472
Expiration Date: unknown
Description: Alert~~~Th Gage Rest Area is closed due to no water available. This closure will be in place until 2025.
Post Date: 2024-10-28 10:01:43.0
Update Date: 2024-11-19 07:08:47.472
Expiration Date: unknown
Title: Alert, I 25 northbound and southbound at mile marker 114, 33 miles south of Socorro.
Description: Alert~~~Posted the northbound & southbound Ft. Craig Rest Area as closed due to no electricity.
Post Date: 2024-11-18 08:44:30.0
Update Date: 2024-11-19 07:08:47.472
Expiration Date: unknown
Description: Alert~~~Posted the northbound & southbound Ft. Craig Rest Area as closed due to no electricity.
Post Date: 2024-11-18 08:44:30.0
Update Date: 2024-11-19 07:08:47.472
Expiration Date: unknown
Title: Fair Driving, NM 532 from mile marker 0 Alto to mile marker 12.
Description: Fair Driving Conditions - Roads are wet with some icy spots. Black ice may exist when temperatures drop.~~~Motorists be advised of snow drifts, use caution, and reduce speed. NMDOT crews have salted, plowed, and will continue to monitor the roads.
Post Date: Mon Nov 18 08:04:46 MST 2024
Update Date: 2024-11-19 09:31:35.0
Expiration Date: unknown
Description: Fair Driving Conditions - Roads are wet with some icy spots. Black ice may exist when temperatures drop.~~~Motorists be advised of snow drifts, use caution, and reduce speed. NMDOT crews have salted, plowed, and will continue to monitor the roads.
Post Date: Mon Nov 18 08:04:46 MST 2024
Update Date: 2024-11-19 09:31:35.0
Expiration Date: unknown
Title: Roadwork, US 60 from mile marker 387, 1 mile west of Clovis to mile marker 389, eastside of Clovis. Roadway closed.
Description: Roadwork~~~Road Reconstruction project on US60/84 from MP 387.800 to MP 389.120. Westbound lanes of US 60 closed for reconstruction from Grand St to Prince St. Traffic will be reduced to one lane in each direction on the existing Eastbound Lanes. Traffic will follow posted detour signage and there is a 12ft width restriction. Oversized or wide loads must use the designated truck bypass off of Hall St. Please follow all posted signage be aware of personnel and equipment in the workzone. Project expected completion date is Summer of 2025 depending on weather and delays. Contractor - AUI, Inc.- John Hale 505-974-1613 ; NMDOT PM- Debbie Ysasi 575-291-5208.
Post Date: 2023-07-17 15:32:10.0
Update Date: 2024-11-15 14:01:18.0
Expiration Date: unknown
Description: Roadwork~~~Road Reconstruction project on US60/84 from MP 387.800 to MP 389.120. Westbound lanes of US 60 closed for reconstruction from Grand St to Prince St. Traffic will be reduced to one lane in each direction on the existing Eastbound Lanes. Traffic will follow posted detour signage and there is a 12ft width restriction. Oversized or wide loads must use the designated truck bypass off of Hall St. Please follow all posted signage be aware of personnel and equipment in the workzone. Project expected completion date is Summer of 2025 depending on weather and delays. Contractor - AUI, Inc.- John Hale 505-974-1613 ; NMDOT PM- Debbie Ysasi 575-291-5208.
Post Date: 2023-07-17 15:32:10.0
Update Date: 2024-11-15 14:01:18.0
Expiration Date: unknown
Title: Roadwork, I 25 at mile marker 75, Williamsburg (T OR C SOUTH).
Description: Roadwork~~~El Terrero Construction, LLC. (Contractor) will be finalizing construction to replace the bridge at I-25 milepost 75, Broadway Street and NM 187 in Williamsburg. The northbound lanes may have intermittent lane closures for striping and signage installation, southbound lanes are complete and open. Regular work hours are 7 a.m.-5 p.m. Monday-Friday. Motorists should expect delays and allow extra time to reach their destinations. Motorists should also use extra caution in the construction area. Access will be maintained to all businesses and residences.
Post Date: 2023-01-16 08:55:34.0
Update Date: 2024-11-19 07:08:47.472
Expiration Date: unknown
Description: Roadwork~~~El Terrero Construction, LLC. (Contractor) will be finalizing construction to replace the bridge at I-25 milepost 75, Broadway Street and NM 187 in Williamsburg. The northbound lanes may have intermittent lane closures for striping and signage installation, southbound lanes are complete and open. Regular work hours are 7 a.m.-5 p.m. Monday-Friday. Motorists should expect delays and allow extra time to reach their destinations. Motorists should also use extra caution in the construction area. Access will be maintained to all businesses and residences.
Post Date: 2023-01-16 08:55:34.0
Update Date: 2024-11-19 07:08:47.472
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 384, Tres Piedras to mile marker 392, 8 miles north of Tres Piedras.
Description: Roadwork~~~Construction has begun on a project to improve 8.337 miles of U.S. 285 at Tres Piedras. The project, which extends from milepost 384.051 on the south to milepost 392.308 on the north, is designed to improve safety and includes the following: . • Rehabilitation of the roadway • Widening of the shoulders on both sides to the roadway • Extending the drainage structures near the roadway • Erosion control • New signing and striping of the roadway. Regular work hours will be 6 a.m.-6 p.m. Monday-Thursday and 6 a.m.-2 p.m. Friday although the contractor may work longer hours or weekends as needed. One lane will be closed for the duration of the project and there is a 24-hour flagging operation in place. Please obey all traffic control personnel and proceed with caution through the roadwork zone. **PLEASE NOTE: THERE IS A 10 FOOT WIDTH RESTRICTION IN PLACE!**
Post Date: 2024-07-15 10:25:56.0
Update Date: 2024-10-30 14:14:54.0
Expiration Date: unknown
Description: Roadwork~~~Construction has begun on a project to improve 8.337 miles of U.S. 285 at Tres Piedras. The project, which extends from milepost 384.051 on the south to milepost 392.308 on the north, is designed to improve safety and includes the following: . • Rehabilitation of the roadway • Widening of the shoulders on both sides to the roadway • Extending the drainage structures near the roadway • Erosion control • New signing and striping of the roadway. Regular work hours will be 6 a.m.-6 p.m. Monday-Thursday and 6 a.m.-2 p.m. Friday although the contractor may work longer hours or weekends as needed. One lane will be closed for the duration of the project and there is a 24-hour flagging operation in place. Please obey all traffic control personnel and proceed with caution through the roadwork zone. **PLEASE NOTE: THERE IS A 10 FOOT WIDTH RESTRICTION IN PLACE!**
Post Date: 2024-07-15 10:25:56.0
Update Date: 2024-10-30 14:14:54.0
Expiration Date: unknown
Title: Roadwork, NM 68 from mile marker 44, 1 mile south of Taos to mile marker 45, Taos.
Description: Roadwork~~~ONGOING: Due to unforeseen issues at Martyr’s Lane, Phase 3 construction and the closure of Martyr’s Lane at Paseo del Pueblo have been extended through mid-August, 2024. The following traffic impact will remain in place: • Southbound motorists can use Camino de la Placita to Civic Plaza Drive, Bent Street, or North Plaza as a detour. ACCESS WILL BE MAINTAINED TO ALL BUSINESSES. Regular work hours are Monday-Friday, 7 a.m.-5:30 p.m., although the contractor may work longer hours or on weekends if needed. Crews will be working Monday, July 1-Wednesday, July 3. They will not be working Thursday, July 4 or Friday, July in observance of Independence Day. Barricades will remain in place for safety. For more information, motorists are encouraged to visit www.taosnm6864.com
Post Date: 2020-04-13 07:53:05.0
Update Date: 2024-08-08 14:28:04.0
Expiration Date: unknown
Description: Roadwork~~~ONGOING: Due to unforeseen issues at Martyr’s Lane, Phase 3 construction and the closure of Martyr’s Lane at Paseo del Pueblo have been extended through mid-August, 2024. The following traffic impact will remain in place: • Southbound motorists can use Camino de la Placita to Civic Plaza Drive, Bent Street, or North Plaza as a detour. ACCESS WILL BE MAINTAINED TO ALL BUSINESSES. Regular work hours are Monday-Friday, 7 a.m.-5:30 p.m., although the contractor may work longer hours or on weekends if needed. Crews will be working Monday, July 1-Wednesday, July 3. They will not be working Thursday, July 4 or Friday, July in observance of Independence Day. Barricades will remain in place for safety. For more information, motorists are encouraged to visit www.taosnm6864.com
Post Date: 2020-04-13 07:53:05.0
Update Date: 2024-08-08 14:28:04.0
Expiration Date: unknown
Title: Seasonal Closure, NM 72 from mile marker 5, 3 miles west of Yankee to mile marker 18, 10 miles east of Yankee. Roadway closed.
Description: Seasonal Closure~~~Road closed to through traffic. The roadway will become impassable due to ice, snow, and snow drifts. No roadway maintenance will be performed throughout the seasonal closure.
Post Date: 2024-11-04 13:57:03.0
Update Date: 2024-11-06 08:43:24.0
Expiration Date: unknown
Description: Seasonal Closure~~~Road closed to through traffic. The roadway will become impassable due to ice, snow, and snow drifts. No roadway maintenance will be performed throughout the seasonal closure.
Post Date: 2024-11-04 13:57:03.0
Update Date: 2024-11-06 08:43:24.0
Expiration Date: unknown
Title: Difficult Driving, NM 126 from mile marker 25, 13 miles west of NM 4 to mile marker 38, at NM 4.
Description: Difficult Driving Conditions - Roads are snow packed and icy. Snow may cause limited visibility.~~~Difficult driving conditions on NM 126, mile marker 25-38 (from the Fish Hatchery to La Cueva Campground). Road is snow packed and icy. Visibility is poor. Please drive with caution, reduce speed and obey all posted traffic signs. Watch for snowplows. This event will be updated as conditions change.
Post Date: 2024-11-04 07:45:33.0
Update Date: 2024-11-04 07:45:33.0
Expiration Date: unknown
Description: Difficult Driving Conditions - Roads are snow packed and icy. Snow may cause limited visibility.~~~Difficult driving conditions on NM 126, mile marker 25-38 (from the Fish Hatchery to La Cueva Campground). Road is snow packed and icy. Visibility is poor. Please drive with caution, reduce speed and obey all posted traffic signs. Watch for snowplows. This event will be updated as conditions change.
Post Date: 2024-11-04 07:45:33.0
Update Date: 2024-11-04 07:45:33.0
Expiration Date: unknown
Title: Difficult Driving, NM 126 from mile marker 5, 5 miles east of Cuba to mile marker 25, 13 miles west of NM 4.
Description: Difficult Driving Conditions - Roads are snow packed and icy. Snow may cause limited visibility.~~~Difficult driving conditions on NM 126, mile marker 5-25 (from east of Cuba to the Fish Hatchery). Road is snow packed and icy. Visibility is poor. Please drive with caution, reduce speed and obey all posted traffic signs. Watch for snowplows. This event will be updated as conditions change.
Post Date: 2024-11-04 07:44:19.0
Update Date: 2024-11-04 07:44:50.0
Expiration Date: unknown
Description: Difficult Driving Conditions - Roads are snow packed and icy. Snow may cause limited visibility.~~~Difficult driving conditions on NM 126, mile marker 5-25 (from east of Cuba to the Fish Hatchery). Road is snow packed and icy. Visibility is poor. Please drive with caution, reduce speed and obey all posted traffic signs. Watch for snowplows. This event will be updated as conditions change.
Post Date: 2024-11-04 07:44:19.0
Update Date: 2024-11-04 07:44:50.0
Expiration Date: unknown
Title: Difficult Driving, NM 4 from mile marker 26, 7 miles west of Sierra De los Pinos to mile marker 46, 13 miles east of Sierra De los Pinos.
Description: Difficult Driving Conditions - Roads are snow packed and icy. Snow may cause limited visibility.~~~Difficult driving conditions on NM 4, mile marker 26-46 (from Sierra de los Pinos to the Los Alamos County Line). Road is snow packed and icy. Visibility is poor. Please drive with caution, reduce speed and obey all posted traffic signs. Watch for snowplows. This event will be updated as conditions change.
Post Date: 2024-11-04 05:21:33.0
Update Date: 2024-11-04 05:21:33.0
Expiration Date: unknown
Description: Difficult Driving Conditions - Roads are snow packed and icy. Snow may cause limited visibility.~~~Difficult driving conditions on NM 4, mile marker 26-46 (from Sierra de los Pinos to the Los Alamos County Line). Road is snow packed and icy. Visibility is poor. Please drive with caution, reduce speed and obey all posted traffic signs. Watch for snowplows. This event will be updated as conditions change.
Post Date: 2024-11-04 05:21:33.0
Update Date: 2024-11-04 05:21:33.0
Expiration Date: unknown
Title: Alert, US 64 from mile marker 6, 6 miles east of Arizona State Line to mile marker 9, 9 miles east of Arizona State Line.
Description: Alert~~~Beginning Monday March 11th, one lane will be closed from 6a.m. until 6p.m. each day, Monday through Friday. The remaining lane will have a width restrict in place of 9' during working hours. Work is expected to be completed by November 20th, 2024. Please obey all traffic control personnel and proceed with caution through the roadwork zone. Expect delays and use caution while travelling through the area.
Post Date: 2024-03-04 14:17:10.0
Update Date: 2024-03-16 01:20:37.0
Expiration Date: unknown
Description: Alert~~~Beginning Monday March 11th, one lane will be closed from 6a.m. until 6p.m. each day, Monday through Friday. The remaining lane will have a width restrict in place of 9' during working hours. Work is expected to be completed by November 20th, 2024. Please obey all traffic control personnel and proceed with caution through the roadwork zone. Expect delays and use caution while travelling through the area.
Post Date: 2024-03-04 14:17:10.0
Update Date: 2024-03-16 01:20:37.0
Expiration Date: unknown
Title: Alert, I 10 at mile marker 20, (LORDSBURG WEST).
Description: Alert~~~The Lordsburg welcome Center and Rest area will be closed until September 2024 for much needed upgrades to the main building, landscaping and restrooms.
Post Date: 2024-06-03 10:54:47.0
Update Date: 2024-11-19 07:08:47.472
Expiration Date: unknown
Description: Alert~~~The Lordsburg welcome Center and Rest area will be closed until September 2024 for much needed upgrades to the main building, landscaping and restrooms.
Post Date: 2024-06-03 10:54:47.0
Update Date: 2024-11-19 07:08:47.472
Expiration Date: unknown
Title: Roadwork, US 64 from mile marker 0, Arizona State Line to mile marker 3 Beclabito.
Description: Roadwork~~~One lane road Use caution when driving through construction area watch for flagmen.
Post Date: 2024-07-01 08:22:39.0
Update Date: 2024-07-08 17:01:51.0
Expiration Date: unknown
Description: Roadwork~~~One lane road Use caution when driving through construction area watch for flagmen.
Post Date: 2024-07-01 08:22:39.0
Update Date: 2024-07-08 17:01:51.0
Expiration Date: unknown
Title: Roadwork, US 54 from mile marker 327 Logan to mile marker 333, 7 miles north of Logan.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Motorists can anticipate minor delays.
Post Date: 2024-08-30 07:09:06.0
Update Date: 2024-08-30 07:09:06.0
Expiration Date: unknown
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Motorists can anticipate minor delays.
Post Date: 2024-08-30 07:09:06.0
Update Date: 2024-08-30 07:09:06.0
Expiration Date: unknown
Title: undefined, I 25 from mile marker 276, (NM 599) to mile marker 302, 18 miles north of Santa Fe.
Description: - Please Select - - Roads are wet and may become slick. Visibility is good with clear skies.~~~Glorieta - Roads are wet at this time.
Post Date: 2019-12-27 22:23:17.0
Update Date: 2019-12-28 13:53:25.0
Expiration Date: unknown
Description: - Please Select - - Roads are wet and may become slick. Visibility is good with clear skies.~~~Glorieta - Roads are wet at this time.
Post Date: 2019-12-27 22:23:17.0
Update Date: 2019-12-28 13:53:25.0
Expiration Date: unknown
Title: Roadwork, NM 566 northbound and southbound from mile marker 6, 6 miles north of I-40 to mile marker 7, 7 miles north of I-40.
Description: Roadwork~~~Roadwork on NM 566, mile marker 6-7 (north of Church Rock) due to a bridge replacement project. All traffic has been shifted onto the detour pavement. Speed reduced to 35mph through the work zone. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2023-12-22 09:19:16.0
Update Date: 2023-12-22 09:19:16.0
Expiration Date: unknown
Description: Roadwork~~~Roadwork on NM 566, mile marker 6-7 (north of Church Rock) due to a bridge replacement project. All traffic has been shifted onto the detour pavement. Speed reduced to 35mph through the work zone. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2023-12-22 09:19:16.0
Update Date: 2023-12-22 09:19:16.0
Expiration Date: unknown
Title: Roadwork, I 25 at mile marker 139, San Antonio (US 380/SAN ANTONIO).
Description: Roadwork~~~Kimo Constructors, Inc. (Contractor) will begin working on the bridge on I-25 San Antonio (Walnut Creek milepost 139). This project consists of bridge rehabilitation, erosion control and drainage. The contractor’s hours of operation are 7 a.m. to 5 p.m. Monday through Friday.
Post Date: 2024-06-21 13:32:05.0
Update Date: 2024-11-19 07:08:47.472
Expiration Date: unknown
Description: Roadwork~~~Kimo Constructors, Inc. (Contractor) will begin working on the bridge on I-25 San Antonio (Walnut Creek milepost 139). This project consists of bridge rehabilitation, erosion control and drainage. The contractor’s hours of operation are 7 a.m. to 5 p.m. Monday through Friday.
Post Date: 2024-06-21 13:32:05.0
Update Date: 2024-11-19 07:08:47.472
Expiration Date: unknown
Title: Roadwork, I 25 at mile marker 63, (NM 152/HILLSBORO).
Description: Roadwork~~~Kimo Constructors, Inc. (Contractor) will be continuing work on the bridges on I-25 at Caballo (Green Horn milepost 63). This project consists of bridge rehabilitation, erosion control and drainage. The contractor’s hours of operation are 7 a.m. to 5 p.m. Monday through Friday.
Post Date: 2024-06-21 13:31:27.0
Update Date: 2024-11-19 07:08:47.472
Expiration Date: unknown
Description: Roadwork~~~Kimo Constructors, Inc. (Contractor) will be continuing work on the bridges on I-25 at Caballo (Green Horn milepost 63). This project consists of bridge rehabilitation, erosion control and drainage. The contractor’s hours of operation are 7 a.m. to 5 p.m. Monday through Friday.
Post Date: 2024-06-21 13:31:27.0
Update Date: 2024-11-19 07:08:47.472
Expiration Date: unknown
Title: Closure, NM 539 from mile marker 0 Navajo City to mile marker 5 Navajo Dam.
Description: Closure~~~N.M. 539 will be closed until December 31, 2024 while contractors conduct exploratory drilling at Navajo Dam. Through traffic will be rerouted onto N.M. 511. Expect delays and use caution while travelling through the area.
Post Date: 2024-09-20 08:26:52.0
Update Date: 2024-09-20 08:26:52.0
Expiration Date: 2024-12-31 23:59:00.0
Description: Closure~~~N.M. 539 will be closed until December 31, 2024 while contractors conduct exploratory drilling at Navajo Dam. Through traffic will be rerouted onto N.M. 511. Expect delays and use caution while travelling through the area.
Post Date: 2024-09-20 08:26:52.0
Update Date: 2024-09-20 08:26:52.0
Expiration Date: 2024-12-31 23:59:00.0
Title: Construction Closure,
Description: NM 423 at Eagle Ranch Rd milepost 2.3-2.7 (Thru 11/30) There will be various shoulder and intermittent lane restrictions. Work is being performed for commercial development. Motorists should anticipate delays. Contractor: Custom Grading Inc
Post Date: 2023-10-20 07:17:26.0
Update Date: 2024-11-06 11:59:32.0
Expiration Date: 2024-11-30 23:59:00.0
Description: NM 423 at Eagle Ranch Rd milepost 2.3-2.7 (Thru 11/30) There will be various shoulder and intermittent lane restrictions. Work is being performed for commercial development. Motorists should anticipate delays. Contractor: Custom Grading Inc
Post Date: 2023-10-20 07:17:26.0
Update Date: 2024-11-06 11:59:32.0
Expiration Date: 2024-11-30 23:59:00.0
Title: Alert, NM 14 from mile marker 28, 1 mile south of Madrid to mile marker 29, Madrid.
Description: Alert~~~Vehicles over 55' in length are prohibited in Madrid N.M.
Post Date: 2023-08-18 16:17:57.0
Update Date: 2024-02-10 19:05:15.0
Expiration Date: unknown
Description: Alert~~~Vehicles over 55' in length are prohibited in Madrid N.M.
Post Date: 2023-08-18 16:17:57.0
Update Date: 2024-02-10 19:05:15.0
Expiration Date: unknown
Title: Roadwork, NM 126 from mile marker 9, 9 miles east of Cuba to mile marker 10, 10 miles east of Cuba.
Description: Roadwork~~~Roadwork on NM 126, mile marker 9-10 (east of Cuba) due to a bridge replacement project. Traffic is down to one lane controlled by traffic signals throughout the work zone. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2024-06-14 09:39:31.0
Update Date: 2024-06-14 09:41:02.0
Expiration Date: unknown
Description: Roadwork~~~Roadwork on NM 126, mile marker 9-10 (east of Cuba) due to a bridge replacement project. Traffic is down to one lane controlled by traffic signals throughout the work zone. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2024-06-14 09:39:31.0
Update Date: 2024-06-14 09:41:02.0
Expiration Date: unknown
Title: Roadwork, NM 566 northbound and southbound at mile marker 0, Church Rock (I-40).
Description: Roadwork~~~Bridge Replacement work on NM 566, mile marker 0 - 0.866 (Church Rock). All traffic has been shifted to the detour pavement. Watch for equipment. This event will be updated as conditions change.
Post Date: 2023-10-13 15:46:41.0
Update Date: 2023-10-13 15:46:41.0
Expiration Date: unknown
Description: Roadwork~~~Bridge Replacement work on NM 566, mile marker 0 - 0.866 (Church Rock). All traffic has been shifted to the detour pavement. Watch for equipment. This event will be updated as conditions change.
Post Date: 2023-10-13 15:46:41.0
Update Date: 2023-10-13 15:46:41.0
Expiration Date: unknown
Title: Roadwork, Roadwork
Description: Roadwork~~~A Mountain Construction, (Contractor) will be continuing the ADA ramps along the I-25 Business Loop on Date Street, Broadway and Main Street. Drivers should anticipate occasional closures of shoulders and side streets to facilitate the removal and replacement of concrete at specific intersections. The contractor will operate from 7 a.m. to 5:30 p.m., Monday through Thursday. This phase of construction is expected to take three months to complete and is subject to weather conditions. Paving operations will commence mid to late December. Further details on this phase will be provided closer to the start of construction
Post Date: 2024-11-08 14:17:28.0
Update Date: 2024-11-08 14:17:28.0
Expiration Date: unknown
Description: Roadwork~~~A Mountain Construction, (Contractor) will be continuing the ADA ramps along the I-25 Business Loop on Date Street, Broadway and Main Street. Drivers should anticipate occasional closures of shoulders and side streets to facilitate the removal and replacement of concrete at specific intersections. The contractor will operate from 7 a.m. to 5:30 p.m., Monday through Thursday. This phase of construction is expected to take three months to complete and is subject to weather conditions. Paving operations will commence mid to late December. Further details on this phase will be provided closer to the start of construction
Post Date: 2024-11-08 14:17:28.0
Update Date: 2024-11-08 14:17:28.0
Expiration Date: unknown
Title: Roadwork, US 60 from mile marker 384, 2 miles east of Cannon AFB to mile marker 385, 3 miles east of Cannon AFB. Roadway closed.
Description: Roadwork~~~Intersection Improvements at Intersection of US 60/84 & HWY 467 MP 384.312 to MP 384.596. US60/84. All lanes are currently open to traffic until work resumes on traffic signals. Work is expected to be completed spring of 2025 depending on weather and delays. Contractor – K Barnett & Sons Project Manager – Hunter McLemore (214)693-3588 K Barnett & Sons TCS – Hector Guerrero (575)309-5299 ; NMDOT PM- Debbie Ysasi 575-291-5208.
Post Date: 2024-04-05 15:23:47.0
Update Date: 2024-11-15 14:01:07.0
Expiration Date: unknown
Description: Roadwork~~~Intersection Improvements at Intersection of US 60/84 & HWY 467 MP 384.312 to MP 384.596. US60/84. All lanes are currently open to traffic until work resumes on traffic signals. Work is expected to be completed spring of 2025 depending on weather and delays. Contractor – K Barnett & Sons Project Manager – Hunter McLemore (214)693-3588 K Barnett & Sons TCS – Hector Guerrero (575)309-5299 ; NMDOT PM- Debbie Ysasi 575-291-5208.
Post Date: 2024-04-05 15:23:47.0
Update Date: 2024-11-15 14:01:07.0
Expiration Date: unknown
Title: Roadwork, US 285 northbound and southbound at mile marker 55, Lakewood.
Description: Roadwork~~~Bridge Repair operations will begin October 7, 2024 on US 285 at 55 (Lakewood). Motorists should expect both northbound and southbound inside lane closures throughout the duration of the project and working hours of 7:00 a.m. to 5:00 p.m. Monday thru Friday. Work is expected to be completed the first part of December 2024, weather permitting. Please use caution, reduce speed, and watch for all personnel and equipment in the area. Contractor: Hasse Construction; NMDOT: Contact 575-840-3035.
Post Date: 2024-10-04 13:02:06.0
Update Date: 2024-10-04 13:02:06.0
Expiration Date: unknown
Description: Roadwork~~~Bridge Repair operations will begin October 7, 2024 on US 285 at 55 (Lakewood). Motorists should expect both northbound and southbound inside lane closures throughout the duration of the project and working hours of 7:00 a.m. to 5:00 p.m. Monday thru Friday. Work is expected to be completed the first part of December 2024, weather permitting. Please use caution, reduce speed, and watch for all personnel and equipment in the area. Contractor: Hasse Construction; NMDOT: Contact 575-840-3035.
Post Date: 2024-10-04 13:02:06.0
Update Date: 2024-10-04 13:02:06.0
Expiration Date: unknown
Title: Roadwork, US 82 from mile marker 171 Lovington to mile marker 172, Lovington. Roadway closed.
Description: Roadwork~~~Construction for NM83/ US82/ and NM18 in the City of Lovington will take place between Milepost 71.98 to 72.13 for NM 18; between MP 171.37 to MP 172.10 US82 north; MP 171.34 to 171.37 US 82 West; and MP 0.00 to 0.48 on NM83. Commercial trucks are to use the bypasses around the city. On US82 from Tatum there is a truck bypass at MP 173. On US82 from Artesia there is a truck route at MP170 that goes to Hobbs on the right and to Tatum on the left. US82 from Texas the truck bypass is on Commercial. From Hobbs, take a left on Urlacher. The intersection of NM 83/82 has been reopened for east, west, and southbound traffic. Northbound traffic is closed from the Central to Jefferson. Use posted detour signs to navigate through construction. Obey all traffic and speed signs, and use caution while driving. Detours are set up for the road work there will be a restriction of 10 feet in width on the project. Construction for the project is scheduled to last an estimated 588 working days. Traffic Control is currently set up in Lovington. Traffic Control has been set up on US 82 Going east. Obey all traffic posting throughout the project. The intent of this project is to reconstruct existing concrete and asphalt paving, curb and gutter, ADA curb ramps, sidewalk, drive pads, storm drainage improvements, lighting, signal equipment replacement, signing, pavement markings and to provide construction traffic control for vehicles and pedestrians. Emergency Contact List for the 2101381R2 project: Contractor: Constructors, Inc., Project Manager- Darin Coslin (575) 626-1140, Superintendent- Hector Sicre (915)316-7732. Traffic Control Supervisor- Javier Cannon (915) 888-7144, Project Safety Office- Tami Mandel (505) 697-1787- Project EEO Officer- Kelly Hicks (575) 302-8408 NMDOT Project Manager John Lara (575) 840-9625, Hobbs Project Office (575) 973-0245.
Post Date: 2021-09-03 10:43:53.0
Update Date: 2024-10-03 16:12:52.0
Expiration Date: unknown
Description: Roadwork~~~Construction for NM83/ US82/ and NM18 in the City of Lovington will take place between Milepost 71.98 to 72.13 for NM 18; between MP 171.37 to MP 172.10 US82 north; MP 171.34 to 171.37 US 82 West; and MP 0.00 to 0.48 on NM83. Commercial trucks are to use the bypasses around the city. On US82 from Tatum there is a truck bypass at MP 173. On US82 from Artesia there is a truck route at MP170 that goes to Hobbs on the right and to Tatum on the left. US82 from Texas the truck bypass is on Commercial. From Hobbs, take a left on Urlacher. The intersection of NM 83/82 has been reopened for east, west, and southbound traffic. Northbound traffic is closed from the Central to Jefferson. Use posted detour signs to navigate through construction. Obey all traffic and speed signs, and use caution while driving. Detours are set up for the road work there will be a restriction of 10 feet in width on the project. Construction for the project is scheduled to last an estimated 588 working days. Traffic Control is currently set up in Lovington. Traffic Control has been set up on US 82 Going east. Obey all traffic posting throughout the project. The intent of this project is to reconstruct existing concrete and asphalt paving, curb and gutter, ADA curb ramps, sidewalk, drive pads, storm drainage improvements, lighting, signal equipment replacement, signing, pavement markings and to provide construction traffic control for vehicles and pedestrians. Emergency Contact List for the 2101381R2 project: Contractor: Constructors, Inc., Project Manager- Darin Coslin (575) 626-1140, Superintendent- Hector Sicre (915)316-7732. Traffic Control Supervisor- Javier Cannon (915) 888-7144, Project Safety Office- Tami Mandel (505) 697-1787- Project EEO Officer- Kelly Hicks (575) 302-8408 NMDOT Project Manager John Lara (575) 840-9625, Hobbs Project Office (575) 973-0245.
Post Date: 2021-09-03 10:43:53.0
Update Date: 2024-10-03 16:12:52.0
Expiration Date: unknown
Title: Alert, NM 152 from mile marker 15, San Lorenzo to mile marker 49, 1 mile east of Hillsboro.
Description: Alert~~~NM 152 between San Lorenzo and Kingston has STEEP GRADES AND NUMEROUS TIGHT TURNS. Trucks without retarder brakes and/or longer than 40 feet in length are PROHIBITED on this section of NM 152. Consider using an alternate route - NM 26 to US 180 or US 60 to NM 12 to US 180. THIS IS A PERMANENT ALERT.
Post Date: 2023-03-03 14:03:42.0
Update Date: 2024-11-19 07:08:47.472
Expiration Date: unknown
Description: Alert~~~NM 152 between San Lorenzo and Kingston has STEEP GRADES AND NUMEROUS TIGHT TURNS. Trucks without retarder brakes and/or longer than 40 feet in length are PROHIBITED on this section of NM 152. Consider using an alternate route - NM 26 to US 180 or US 60 to NM 12 to US 180. THIS IS A PERMANENT ALERT.
Post Date: 2023-03-03 14:03:42.0
Update Date: 2024-11-19 07:08:47.472
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 6, 6 miles north of TX State Line to mile marker 17, 1 mile north of Malaga. Roadway closed.
Description: Roadwork~~~FNF Construction will be reconstructing the roadway, working on bridge rehab and extending drainage structures. Expect lane closures and some delays. There is a 12 foot restriction the entire corridor. WIDE LOADS SHOULD SEEK ALTERNATE ROUTE. Contact Information: FNF Project Manager - Greg Williams 480-290-0383 cell. FNF Traffic Control Supervisor - Christian Day 480-305-4872 cell. NMDOT Project Manager - Juan Salas 575-626-9882
Post Date: 2022-06-03 07:40:05.0
Update Date: 2024-07-12 10:37:42.0
Expiration Date: unknown
Description: Roadwork~~~FNF Construction will be reconstructing the roadway, working on bridge rehab and extending drainage structures. Expect lane closures and some delays. There is a 12 foot restriction the entire corridor. WIDE LOADS SHOULD SEEK ALTERNATE ROUTE. Contact Information: FNF Project Manager - Greg Williams 480-290-0383 cell. FNF Traffic Control Supervisor - Christian Day 480-305-4872 cell. NMDOT Project Manager - Juan Salas 575-626-9882
Post Date: 2022-06-03 07:40:05.0
Update Date: 2024-07-12 10:37:42.0
Expiration Date: unknown
Title: Roadwork, I 25 at mile marker 35, (RINCON).
Description: Roadwork~~~Kimo Constructors, Inc. (Contractor) will begin work on erosion control along I-25 between Rincon and Hatch. The contractor will be working on the southbound off ramp and Rincon (exit 35) and near milepost 43, I-25 may be reduced to a single lane depending on the work location, drivers should be vigilant for construction signing. The contractor’s hours of operation are 7 a.m. to 5 p.m. Monday through Friday.
Post Date: 2024-02-02 15:08:46.0
Update Date: 2024-11-19 07:08:47.472
Expiration Date: unknown
Description: Roadwork~~~Kimo Constructors, Inc. (Contractor) will begin work on erosion control along I-25 between Rincon and Hatch. The contractor will be working on the southbound off ramp and Rincon (exit 35) and near milepost 43, I-25 may be reduced to a single lane depending on the work location, drivers should be vigilant for construction signing. The contractor’s hours of operation are 7 a.m. to 5 p.m. Monday through Friday.
Post Date: 2024-02-02 15:08:46.0
Update Date: 2024-11-19 07:08:47.472
Expiration Date: unknown
For official NM traffic info visit: New Mexico DOT Traffic Site
Tweets by ABQTraffic