Fort Bayard Traffic and Road Conditions
×
Warning! Do not attempt to use any of these features while driving a vehicle.
Fort Bayard Traffic Map
No Traffic Flow? Choose Live Map then Zoom in Closer
How to use the Fort Bayard Traffic Map
Traffic flow lines: Red/White dashed lines = Closed Road, Grey/White dashed lines = Road Work, Red lines = Heavy traffic flow, Yellow/Orange lines = Medium flow and Green = normal traffic. Black lines or No traffic flow lines could indicate a closed road, but in most cases it means that either there is not enough vehicle flow to register or traffic isn't monitored. Also, If you do not see traffic flow, you can zoom in closer to reveal localized data. If you are unable to pan the map, press here (to focus off of the map) and try again.
Traffic Incidents (beta): Each image represents traffic event or incident such as road construction, closure (red circle with a white dash) or accident.
Traffic Alert
Tips
- Click or touch the map to move in different directions.
- If you do not see any markers on the map, try zooming in one or two levels using "+" on the top left side. However, they are not always available.
- Click an incident icon on the map to get more information.
FAQs
Q) How often is the map updated?
A) The traffic flow is updated at loadtime and upon movement outside the initial map view, or upon refresh of the page. Any incident markers are checked for updates approximately every 5-10 minutes, but you need to reload the page to load any new updates; the data provided may still be the same status/view as before. Information shown is as only reliable as how it is reported to us.
Q) The roads are backed up or closed, but the map does not show the reason why, what's the deal?A) Municipal traffic monitors or GPS trackers may not be available, could be offline, or reports and alerts are not syndicated to media outside of the area to use on the map. This is especially true for rural areas. You are encouraged to leave a road conditions report to help others.
Q) I see traffic alerts in the box below for the state, but they aren't related to the area I'm in? A) We attempt to display alerts as specific to the area as possible, however in some cases the data we receive will only allow us to provide it by county or even statewide.
Q) Are you an official source of traffic information? A) We are not an official source of traffic or real-time data. We have contracts and licenses to display certain up-to-date information that comes direct from some DOTs in various states, and the traffic flow on the maps is provided by Google, Mapbox or TomTom. However, the data shown here should only be used for light informational and reference purposes and not to make critical decisions. Your safest option on the web is to use your state-run traffic website, or to call the DOT traffic line for your state, local authorities, or the state's 511 number if available.
Fort Bayard Traffic Alerts
Title: Construction Closure, I 40 eastbound and westbound at mile marker 183, 11 miles west of Moriarity.
Description: I-40 MP 180-185 (Phased) There will be continuous lane and shoulder closures. Work is being performed for highway construction. Motorists should anticipate delays. Contractor: AUI Inc Project A302121 NMDOT: TBA
Post Date: 2024-07-31 11:41:57.0
Update Date: 2024-09-18 11:53:17.0
Expiration Date: 2024-12-31 23:59:00.0
Description: I-40 MP 180-185 (Phased) There will be continuous lane and shoulder closures. Work is being performed for highway construction. Motorists should anticipate delays. Contractor: AUI Inc Project A302121 NMDOT: TBA
Post Date: 2024-07-31 11:41:57.0
Update Date: 2024-09-18 11:53:17.0
Expiration Date: 2024-12-31 23:59:00.0
Title: Lane Closure, US 64 from mile marker 242, 12 miles west of Taos to mile marker 243, 11 miles west of Taos.
Description: Lane Closure~~~The New Mexico Department of Transportation, in conjunction with Ulteig Engineers, Inc., will begin performing a routine inspection of the Rio Grande Gorge Bridge beginning Friday October 25, 2024. *** Ulteig employees will be working 7 days a week, except holidays, during daylight hours. While they are working, the speed limit across the bridge will be reduced to 35 mph. One lane will be closed to traffic during working hours and a flagging operation will be in place to allow motorists to safely pass through the work zone. All traffic control devices will be removed at the end of the workday and the bridge reopened to traffic. *** The inspection is expected to be completed by December 31, 2024. *** Drivers are urged to watch out for workers in the area, observe traffic control signs and reduce speed to the posted speed limit.
Post Date: 2024-10-30 13:25:04.0
Update Date: 2024-10-30 13:25:04.0
Expiration Date: 2024-12-31 17:01:00.0
Description: Lane Closure~~~The New Mexico Department of Transportation, in conjunction with Ulteig Engineers, Inc., will begin performing a routine inspection of the Rio Grande Gorge Bridge beginning Friday October 25, 2024. *** Ulteig employees will be working 7 days a week, except holidays, during daylight hours. While they are working, the speed limit across the bridge will be reduced to 35 mph. One lane will be closed to traffic during working hours and a flagging operation will be in place to allow motorists to safely pass through the work zone. All traffic control devices will be removed at the end of the workday and the bridge reopened to traffic. *** The inspection is expected to be completed by December 31, 2024. *** Drivers are urged to watch out for workers in the area, observe traffic control signs and reduce speed to the posted speed limit.
Post Date: 2024-10-30 13:25:04.0
Update Date: 2024-10-30 13:25:04.0
Expiration Date: 2024-12-31 17:01:00.0
Title: Roadwork, I 10 from mile marker 140, Mesilla (NM 28/MESILLA) to mile marker 142, San Pablo (NM 478/MAIN ST.).
Description: Roadwork~~~La Calerita Construction, LLC. (Contractor) will be continuing a bridge rehabilitation project on I-10 over the University Ave Interchange, milepost 141. This project includes bridge rehabilitation, roadway reconstruction and lighting. Crews will be working on the installation of detour crossovers on I-10, and installation of concrete barrier wall for the safety of the traveling public. A lane closure is expected for the next two weeks with all traffic shifted to the outside driving lanes in both eastbound and westbound lanes. The contractor’s working hours are Monday through Friday from 7 a.m. to 5 p.m.
Post Date: 2024-09-25 05:26:40.0
Update Date: 2024-11-04 14:19:40.143
Expiration Date: unknown
Description: Roadwork~~~La Calerita Construction, LLC. (Contractor) will be continuing a bridge rehabilitation project on I-10 over the University Ave Interchange, milepost 141. This project includes bridge rehabilitation, roadway reconstruction and lighting. Crews will be working on the installation of detour crossovers on I-10, and installation of concrete barrier wall for the safety of the traveling public. A lane closure is expected for the next two weeks with all traffic shifted to the outside driving lanes in both eastbound and westbound lanes. The contractor’s working hours are Monday through Friday from 7 a.m. to 5 p.m.
Post Date: 2024-09-25 05:26:40.0
Update Date: 2024-11-04 14:19:40.143
Expiration Date: unknown
Title: Roadwork, I 40 eastbound and westbound from mile marker 255, 18 miles west of Santa Rosa to mile marker 263, (SAN IGNACIO). Left lane closed.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions.
Post Date: 2024-10-23 07:37:05.0
Update Date: 2024-10-23 07:37:05.0
Expiration Date: unknown
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions.
Post Date: 2024-10-23 07:37:05.0
Update Date: 2024-10-23 07:37:05.0
Expiration Date: unknown
Title: Roadwork, I 25 from mile marker 227, (Comanche) to mile marker 228, (MONTGOMERY).
Description: Roadwork~~~Roadwork, I-25 Improved, Comanche to Montgomery (MP 226-229) Drivers should anticipate lane reductions on I-25 and the local streets, and lane closures during off peak hours (outside of typical commute hours and weekends) In order to complete this large project on schedule, crews will be working day and night and up to seven days each week. I-25 travel lanes in the work zone will shift the median in August. Visit the project website at i25improved.com for more info. Call the team with questions at 505-785-7623 or email at info@I25improved.com Contractor: AUI Inc. Project Number: A301901 NMDOT: William Rose
Post Date: 2024-08-07 11:57:32.0
Update Date: 2024-08-07 12:04:16.0
Expiration Date: unknown
Description: Roadwork~~~Roadwork, I-25 Improved, Comanche to Montgomery (MP 226-229) Drivers should anticipate lane reductions on I-25 and the local streets, and lane closures during off peak hours (outside of typical commute hours and weekends) In order to complete this large project on schedule, crews will be working day and night and up to seven days each week. I-25 travel lanes in the work zone will shift the median in August. Visit the project website at i25improved.com for more info. Call the team with questions at 505-785-7623 or email at info@I25improved.com Contractor: AUI Inc. Project Number: A301901 NMDOT: William Rose
Post Date: 2024-08-07 11:57:32.0
Update Date: 2024-08-07 12:04:16.0
Expiration Date: unknown
Title: Alert, Alert
Description: Alert~~~Low Clearance Structure, CMV's please use I-40 between exits 89 & 96. Height Restriction 13'6".
Post Date: 2024-06-05 10:26:04.0
Update Date: 2024-06-24 11:24:50.0
Expiration Date: unknown
Description: Alert~~~Low Clearance Structure, CMV's please use I-40 between exits 89 & 96. Height Restriction 13'6".
Post Date: 2024-06-05 10:26:04.0
Update Date: 2024-06-24 11:24:50.0
Expiration Date: unknown
Title: Roadwork, I 25 from mile marker 305, 21 miles north of Santa Fe to mile marker 309, 25 miles north of Santa Fe.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions along with a reduced speed throughout the construction zone.
Post Date: 2024-05-01 10:35:11.0
Update Date: 2024-08-30 07:16:49.0
Expiration Date: unknown
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions along with a reduced speed throughout the construction zone.
Post Date: 2024-05-01 10:35:11.0
Update Date: 2024-08-30 07:16:49.0
Expiration Date: unknown
Title: Roadwork, I 40 eastbound and westbound at mile marker 44, Coolidge Interchange.
Description: Roadwork~~~Roadwork on I-40, mile marker 44 (Coolidge). Eastbound and Westbound passing lanes are closed. Speed reduced to 55 mph the construction zone. For more information contact El Terrero Construction at (505) 896-3864. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2024-04-30 13:48:15.0
Update Date: 2024-05-22 12:34:33.0
Expiration Date: unknown
Description: Roadwork~~~Roadwork on I-40, mile marker 44 (Coolidge). Eastbound and Westbound passing lanes are closed. Speed reduced to 55 mph the construction zone. For more information contact El Terrero Construction at (505) 896-3864. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2024-04-30 13:48:15.0
Update Date: 2024-05-22 12:34:33.0
Expiration Date: unknown
Title: Construction Closure, NM 1 westbound at mile marker 0, Elephant Butte.
Description: Construction Closure~~~NM 1 westbound lane at milepost 0 will be closed due to bridge repairs. Motorists are asked to reduce speed, obey posted signs, and be cautious of personnel and equipment in the areas listed below. These closures will remain in place until repairs can be made.
Post Date: 2024-10-29 17:45:01.0
Update Date: 2024-11-04 14:19:40.143
Expiration Date: unknown
Description: Construction Closure~~~NM 1 westbound lane at milepost 0 will be closed due to bridge repairs. Motorists are asked to reduce speed, obey posted signs, and be cautious of personnel and equipment in the areas listed below. These closures will remain in place until repairs can be made.
Post Date: 2024-10-29 17:45:01.0
Update Date: 2024-11-04 14:19:40.143
Expiration Date: unknown
Title: Lane Closure, I 25 northbound at mile marker 92, (MITCHELL POINT).
Description: Lane Closure~~~I-25 northbound driving lane will be closed at milepost 92(Mitchell Point) and NM 1 westbound lane at milepost 0 will be closed due to roadway repairs. Motorists are asked to reduce speed, obey posted signs, and be cautious of personnel and equipment in the areas listed below. These closures will remain in place until repairs can be made.
Post Date: 2024-10-29 17:44:21.0
Update Date: 2024-11-04 14:19:40.143
Expiration Date: unknown
Description: Lane Closure~~~I-25 northbound driving lane will be closed at milepost 92(Mitchell Point) and NM 1 westbound lane at milepost 0 will be closed due to roadway repairs. Motorists are asked to reduce speed, obey posted signs, and be cautious of personnel and equipment in the areas listed below. These closures will remain in place until repairs can be made.
Post Date: 2024-10-29 17:44:21.0
Update Date: 2024-11-04 14:19:40.143
Expiration Date: unknown
Title: Roadwork, US 64 from mile marker 273, 13 miles west of Eagle Nest to mile marker 276, 10 miles west of Eagle Nest. Left lane closed.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. A 10ft width and 55 length (bumper to bumper) restriction is in place for this phase of construction. Motorist can anticipate delays.
Post Date: 2024-06-25 11:01:43.0
Update Date: 2024-08-30 07:14:12.0
Expiration Date: unknown
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. A 10ft width and 55 length (bumper to bumper) restriction is in place for this phase of construction. Motorist can anticipate delays.
Post Date: 2024-06-25 11:01:43.0
Update Date: 2024-08-30 07:14:12.0
Expiration Date: unknown
Title: Roadwork, NM 39 from mile marker 14, 10 miles south of Gallegos to mile marker 19, 5 miles south of Gallegos. Left lane and left shoulder closed.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Speed has been reduced to 40 mph. Motorists can anticipate minor delays.
Post Date: 2024-10-22 09:57:25.0
Update Date: 2024-10-22 09:57:25.0
Expiration Date: unknown
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Speed has been reduced to 40 mph. Motorists can anticipate minor delays.
Post Date: 2024-10-22 09:57:25.0
Update Date: 2024-10-22 09:57:25.0
Expiration Date: unknown
Title: Conditions exist in the Taos area.
Description: Please Select~~~Crews are out salting and sanding. Drive with caution. Please stay behind snowplows at least 50 feet.
Post Date: 2022-02-22 12:16:48.0
Update Date: 2022-02-22 18:28:52.0
Expiration Date: unknown
Description: Please Select~~~Crews are out salting and sanding. Drive with caution. Please stay behind snowplows at least 50 feet.
Post Date: 2022-02-22 12:16:48.0
Update Date: 2022-02-22 18:28:52.0
Expiration Date: unknown
Title: undefined, US 64 from mile marker 266, 12 miles east of Taos to mile marker 272, 14 miles west of Eagle Nest.
Description: Please Select~~~
Post Date: 2022-02-22 05:18:04.0
Update Date: 2022-02-22 19:43:56.0
Expiration Date: unknown
Description: Please Select~~~
Post Date: 2022-02-22 05:18:04.0
Update Date: 2022-02-22 19:43:56.0
Expiration Date: unknown
Title: Roadwork, US 54 from mile marker 151, 19 miles south of Corona to mile marker 163, 7 miles south of Corona.
Description: Roadwork~~~New Roadway construction to include drainage structures is underway between MP 151.6 and MP 163.7 (south of Corona) on US 54. Motorists should obey all construction signing and watch for construction personnel and equipment in the area. Speed limit has been reduced to 45 MPH in the construction zone. Lanes are to remain open for traffic during this phase of the project. Project is scheduled to be finished in Fall of 2024. NMDOT Project Manager, Arron Clark (575)626-9817; Contractor, FNF Construction Inc., Project Manager, Rob Woods (602) 989-1692; Traffic Control Supervisor, David Hernandez (575) 800-4663.
Post Date: 2023-04-18 12:53:43.0
Update Date: 2024-07-12 10:30:03.0
Expiration Date: unknown
Description: Roadwork~~~New Roadway construction to include drainage structures is underway between MP 151.6 and MP 163.7 (south of Corona) on US 54. Motorists should obey all construction signing and watch for construction personnel and equipment in the area. Speed limit has been reduced to 45 MPH in the construction zone. Lanes are to remain open for traffic during this phase of the project. Project is scheduled to be finished in Fall of 2024. NMDOT Project Manager, Arron Clark (575)626-9817; Contractor, FNF Construction Inc., Project Manager, Rob Woods (602) 989-1692; Traffic Control Supervisor, David Hernandez (575) 800-4663.
Post Date: 2023-04-18 12:53:43.0
Update Date: 2024-07-12 10:30:03.0
Expiration Date: unknown
Title: Roadwork, NM 68 from mile marker 4, 3 miles south of Alcalde to mile marker 12, 2 miles south of Velarde.
Description: Roadwork~~~There will be intermittent lane closures and traffic switches during this time as construction progresses. This project is scheduled for completion in the fall of 2024. Please obey all traffic control personnel and proceed with caution through the roadwork zone. Expect delays and use caution while travelling through the area.
Post Date: 2020-09-15 10:02:28.0
Update Date: 2024-03-04 14:19:27.0
Expiration Date: unknown
Description: Roadwork~~~There will be intermittent lane closures and traffic switches during this time as construction progresses. This project is scheduled for completion in the fall of 2024. Please obey all traffic control personnel and proceed with caution through the roadwork zone. Expect delays and use caution while travelling through the area.
Post Date: 2020-09-15 10:02:28.0
Update Date: 2024-03-04 14:19:27.0
Expiration Date: unknown
Title: Roadwork, I 25 from mile marker 140, 7 miles south of Socorro to mile marker 150, (SOCORRO NORTH).
Description: Roadwork~~~Mountain States Constructors, Inc. (Contractor) will be continuing the roadway rehabilitation project on Interstate 25 from milepost 140 (Socorro South) to milepost 150 (Socorro North). Milling and paving operations are now in place with multiple lanes closures in the work zone. Please use caution for large slow-moving equipment exiting and entering the roadway. The subcontractors are continuing with the replacement of guardrail throughout the project. Overnight lane closures may remain in place as needed. The contractor’s hours of operation will be from 6 a.m. to 6 p.m., Monday through Friday.
Post Date: 2024-06-11 16:55:55.0
Update Date: 2024-11-04 14:19:40.143
Expiration Date: unknown
Description: Roadwork~~~Mountain States Constructors, Inc. (Contractor) will be continuing the roadway rehabilitation project on Interstate 25 from milepost 140 (Socorro South) to milepost 150 (Socorro North). Milling and paving operations are now in place with multiple lanes closures in the work zone. Please use caution for large slow-moving equipment exiting and entering the roadway. The subcontractors are continuing with the replacement of guardrail throughout the project. Overnight lane closures may remain in place as needed. The contractor’s hours of operation will be from 6 a.m. to 6 p.m., Monday through Friday.
Post Date: 2024-06-11 16:55:55.0
Update Date: 2024-11-04 14:19:40.143
Expiration Date: unknown
Title: Roadwork, NM 434 from mile marker 21, 5 miles south of Black Lake to mile marker 24, 2 miles south of Black Lake.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions along with a reduced speed throughout the construction zone. A 10ft width and 55ft length restriction is in place for this project.
Post Date: 2024-05-07 07:42:17.0
Update Date: 2024-08-30 07:16:08.0
Expiration Date: unknown
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions along with a reduced speed throughout the construction zone. A 10ft width and 55ft length restriction is in place for this project.
Post Date: 2024-05-07 07:42:17.0
Update Date: 2024-08-30 07:16:08.0
Expiration Date: unknown
Title: Roadwork, I 25 from mile marker 454, Raton to mile marker 460, (RATON PASS/PORT OF ENTRY).
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. A 12 ft. width restriction is in place and speed has been reduced to 55 mph. Motorists can anticipate minor delays.
Post Date: 2024-05-07 07:37:27.0
Update Date: 2024-10-22 09:59:18.0
Expiration Date: unknown
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. A 12 ft. width restriction is in place and speed has been reduced to 55 mph. Motorists can anticipate minor delays.
Post Date: 2024-05-07 07:37:27.0
Update Date: 2024-10-22 09:59:18.0
Expiration Date: unknown
Title: Alert, NM 42 from mile marker 0 , Corona to mile marker 35 , Willard.
Description: Alert~~~N.M. 42 will be closed intermittently to allow vehicles carrying wind turbine blades to safely access the roadway. Expect delays and use caution while travelling through the area.
Post Date: 2024-08-06 07:34:33.0
Update Date: 2024-08-06 07:34:33.0
Expiration Date: unknown
Description: Alert~~~N.M. 42 will be closed intermittently to allow vehicles carrying wind turbine blades to safely access the roadway. Expect delays and use caution while travelling through the area.
Post Date: 2024-08-06 07:34:33.0
Update Date: 2024-08-06 07:34:33.0
Expiration Date: unknown
Title: Construction Closure,
Description: Closure, Montgomery Blvd. Loop Ramp 9/3. The westbound Montgomery Boulevard loop ramp to southbound I-25 in Albuquerque will be permanently closed starting the night of 9/3. Drivers will turn left from Montgomery Boulevard onto the frontage road to access southbound I-25. An additional left-turn lane will be added to accommodate the increase in traffic turning left. Visit the project website at i25improved.com for a map and more information. Call the team at 505-785-7623 or email them at info@i25improved.com with any questions. Contractor: AUI Inc. Project Number: A301901 NMDOT: William Rose
Post Date: 2024-09-03 08:26:35.0
Update Date: 2024-09-03 08:26:35.0
Expiration Date: unknown
Description: Closure, Montgomery Blvd. Loop Ramp 9/3. The westbound Montgomery Boulevard loop ramp to southbound I-25 in Albuquerque will be permanently closed starting the night of 9/3. Drivers will turn left from Montgomery Boulevard onto the frontage road to access southbound I-25. An additional left-turn lane will be added to accommodate the increase in traffic turning left. Visit the project website at i25improved.com for a map and more information. Call the team at 505-785-7623 or email them at info@i25improved.com with any questions. Contractor: AUI Inc. Project Number: A301901 NMDOT: William Rose
Post Date: 2024-09-03 08:26:35.0
Update Date: 2024-09-03 08:26:35.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 16, Malaga to mile marker 17, 1 mile north of Malaga. Left lane and left shoulder closed.
Description: Roadwork~~~Roadwork~~Roadway and Bridge Replacement Construction is underway on US 285 between MP 16.390 to MP 17.757. Motorists can expect a one lane closure with pilot car. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. The Maximum Posted Speed Limit during construction will be 45 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. This Project is 450 working days. Expected completion date is to be determined at a future date. Be aware of multiple construction operations taking place throughout the construction corridor. Contractor: Constructors Inc- Superintendent, Jose Louis Samaniega (915) 262-7475; Traffic Control Supervisor- Francisco Rodriguez (915) 540-2938; NMDOT Project Manager- Juan Salas 575-626-9882
Post Date: 2022-03-31 08:38:54.0
Update Date: 2023-08-01 12:03:57.0
Expiration Date: unknown
Description: Roadwork~~~Roadwork~~Roadway and Bridge Replacement Construction is underway on US 285 between MP 16.390 to MP 17.757. Motorists can expect a one lane closure with pilot car. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. The Maximum Posted Speed Limit during construction will be 45 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. This Project is 450 working days. Expected completion date is to be determined at a future date. Be aware of multiple construction operations taking place throughout the construction corridor. Contractor: Constructors Inc- Superintendent, Jose Louis Samaniega (915) 262-7475; Traffic Control Supervisor- Francisco Rodriguez (915) 540-2938; NMDOT Project Manager- Juan Salas 575-626-9882
Post Date: 2022-03-31 08:38:54.0
Update Date: 2023-08-01 12:03:57.0
Expiration Date: unknown
Title: Construction Closure, NM 109 northbound and southbound at mile marker 5, 1 mile north of Jarales.
Description: NM 109 MP 5.7 (thru 11/30) The New Mexico Department of Transportation will have a continuous road closure of the highway. Detours will be established. Work is being performed for bridge and road construction. Motorists should anticipate delays. Contractor: FNF Project A302220 NMDOT: NetoRey Terrazas
Post Date: 2024-03-28 10:58:59.0
Update Date: 2024-09-18 11:50:40.0
Expiration Date: 2024-11-30 23:59:00.0
Description: NM 109 MP 5.7 (thru 11/30) The New Mexico Department of Transportation will have a continuous road closure of the highway. Detours will be established. Work is being performed for bridge and road construction. Motorists should anticipate delays. Contractor: FNF Project A302220 NMDOT: NetoRey Terrazas
Post Date: 2024-03-28 10:58:59.0
Update Date: 2024-09-18 11:50:40.0
Expiration Date: 2024-11-30 23:59:00.0
Title: Construction Closure, NM 14 northbound and southbound and eastbound and westbound at mile marker 6, Sandia Crest Rd..
Description: NM 14, Crest Rd, Frost Rd MP 6 (Phased) There will be continuous lane and shoulder closures. Work is being performed for highway construction. Motorists should anticipate delays. Contractor: Star Paving NMDOT: Jeremy Maestas
Post Date: 2024-03-28 10:48:46.0
Update Date: 2024-09-18 11:53:42.0
Expiration Date: 2024-12-31 23:59:00.0
Description: NM 14, Crest Rd, Frost Rd MP 6 (Phased) There will be continuous lane and shoulder closures. Work is being performed for highway construction. Motorists should anticipate delays. Contractor: Star Paving NMDOT: Jeremy Maestas
Post Date: 2024-03-28 10:48:46.0
Update Date: 2024-09-18 11:53:42.0
Expiration Date: 2024-12-31 23:59:00.0
Title: Closure, Closure
Description: Closure~~~Acoma Rest Area is currently closed due to maintenance. Please use other facilities.
Post Date: 2024-10-24 15:25:31.0
Update Date: 2024-10-24 15:25:31.0
Expiration Date: unknown
Description: Closure~~~Acoma Rest Area is currently closed due to maintenance. Please use other facilities.
Post Date: 2024-10-24 15:25:31.0
Update Date: 2024-10-24 15:25:31.0
Expiration Date: unknown
Title: Roadwork, US 60 northbound and southbound from mile marker 186, 5 miles east of Cannon AFB to mile marker 188, 7 miles east of Cannon AFB.
Description: Roadwork~~~The NMDOT and FNF Construction will begin a bridge replacement project on U.S. 60 south of Mountainair on April 24, 2023. The project will be in Socorro County between mile post 186.92 and 187.73. Motorists traveling on this section of US 60 should expect delays and allow extra time to reach their destinations. They should also use extreme caution in the construction zone and obey any posted speed limits.
Post Date: 2024-07-18 12:53:53.0
Update Date: 2024-11-04 14:19:40.143
Expiration Date: unknown
Description: Roadwork~~~The NMDOT and FNF Construction will begin a bridge replacement project on U.S. 60 south of Mountainair on April 24, 2023. The project will be in Socorro County between mile post 186.92 and 187.73. Motorists traveling on this section of US 60 should expect delays and allow extra time to reach their destinations. They should also use extreme caution in the construction zone and obey any posted speed limits.
Post Date: 2024-07-18 12:53:53.0
Update Date: 2024-11-04 14:19:40.143
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 17, 1 mile north of Malaga to mile marker 21, Loving.
Description: Roadwork~~~Roadwork Construction is underway on US 285 between MP 17.386 to MP 21.974. Motorists can expect a one lane closure with pilot car. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. The Maximum Posted Speed Limit during construction will be 45 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. This Project is 450 working days. Expected completion date is to be determined at a future date. Be aware of multiple construction operations taking place throughout the construction corridor. Contractor: Constructors Inc- Superintendent, Jose Louis Samaniega (915) 262-7475; Traffic Control Supervisor- Francisco Rodriguez (915) 540-2938; NMDOT Project Manager- Brian Torres 575-626-4278.
Post Date: 2020-08-13 14:57:21.0
Update Date: 2024-07-12 10:41:28.0
Expiration Date: unknown
Description: Roadwork~~~Roadwork Construction is underway on US 285 between MP 17.386 to MP 21.974. Motorists can expect a one lane closure with pilot car. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. The Maximum Posted Speed Limit during construction will be 45 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. This Project is 450 working days. Expected completion date is to be determined at a future date. Be aware of multiple construction operations taking place throughout the construction corridor. Contractor: Constructors Inc- Superintendent, Jose Louis Samaniega (915) 262-7475; Traffic Control Supervisor- Francisco Rodriguez (915) 540-2938; NMDOT Project Manager- Brian Torres 575-626-4278.
Post Date: 2020-08-13 14:57:21.0
Update Date: 2024-07-12 10:41:28.0
Expiration Date: unknown
Title: Alert, NM 104 from mile marker 70, 1 mile east of Mesa Rica to mile marker 90, 15 miles east of Conchas. Roadway closed.
Description: Alert~~~Bridge NO. 5995 at mile marker 71.5, Bridge No. 5254 at mile marker 81.8 and Bridge No. 5257 at mile marker 87.2 all have weight restrictions of 25 tons. Please seek alternate route.
Post Date: 2024-01-11 10:09:46.0
Update Date: 2024-08-30 07:16:57.0
Expiration Date: unknown
Description: Alert~~~Bridge NO. 5995 at mile marker 71.5, Bridge No. 5254 at mile marker 81.8 and Bridge No. 5257 at mile marker 87.2 all have weight restrictions of 25 tons. Please seek alternate route.
Post Date: 2024-01-11 10:09:46.0
Update Date: 2024-08-30 07:16:57.0
Expiration Date: unknown
Title: Construction Closure, NM 500 eastbound and westbound at mile marker 2.
Description: NM 500 EB & WB MP 10-11 Diversion Channal to 2nd St (thru 1/31/25) There will be various shoulder and lane restrictions. Work is being performed for highway construction. Motorists should anticipate delays. Contractor: H.O Construction Project A300945 Bernalillo County
Post Date: 2024-05-09 18:01:05.0
Update Date: 2024-09-18 11:52:15.0
Expiration Date: 2025-01-31 23:59:00.0
Description: NM 500 EB & WB MP 10-11 Diversion Channal to 2nd St (thru 1/31/25) There will be various shoulder and lane restrictions. Work is being performed for highway construction. Motorists should anticipate delays. Contractor: H.O Construction Project A300945 Bernalillo County
Post Date: 2024-05-09 18:01:05.0
Update Date: 2024-09-18 11:52:15.0
Expiration Date: 2025-01-31 23:59:00.0
Title: Roadwork, US 64 from mile marker 323, 13 miles west of Raton to mile marker 330, 16 miles west of Raton. Left lane closed.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Speed has been reduced and motorists can anticipate minor delays.
Post Date: 2024-08-08 08:52:25.0
Update Date: 2024-10-22 09:59:50.0
Expiration Date: unknown
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Speed has been reduced and motorists can anticipate minor delays.
Post Date: 2024-08-08 08:52:25.0
Update Date: 2024-10-22 09:59:50.0
Expiration Date: unknown
Title: Roadwork, NM 113 from mile marker 0, at NM 9 to mile marker 10, 10 miles north of NM 9.
Description: Roadwork~~~The New Mexico Department of Transportation (NMDOT) has completed “Chip Sealing and Brooming” operations on NM 113 in and around Animas and Hachita. Crews will begin Fog Sealing operations within the next month. Speed limits will be reduced, no center stripe with loose gravel on roadway.
Post Date: 2024-06-06 07:54:15.0
Update Date: 2024-11-04 14:19:40.143
Expiration Date: unknown
Description: Roadwork~~~The New Mexico Department of Transportation (NMDOT) has completed “Chip Sealing and Brooming” operations on NM 113 in and around Animas and Hachita. Crews will begin Fog Sealing operations within the next month. Speed limits will be reduced, no center stripe with loose gravel on roadway.
Post Date: 2024-06-06 07:54:15.0
Update Date: 2024-11-04 14:19:40.143
Expiration Date: unknown
Title: Roadwork, I 40 from mile marker 344, 8 miles east of Tucumacari to mile marker 350, 14 miles east of Tucumacari.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Speed has been reduced and motorists can anticipate minor delays.
Post Date: 2024-06-06 07:27:00.0
Update Date: 2024-08-30 07:14:32.0
Expiration Date: unknown
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Speed has been reduced and motorists can anticipate minor delays.
Post Date: 2024-06-06 07:27:00.0
Update Date: 2024-08-30 07:14:32.0
Expiration Date: unknown
Title: Lane Closure, US 285 at mile marker 88, 13 miles south of Midway.
Description: Lane Closure~~~Motorists please be advised southbound lanes on US 285 at mm 88 (south of Midway) are closed due to bridge damage from flooding. Northbound lanes will be open for both north and southbound traffic at MM88. Motorists are to reduce speed and proceed with caution.
Post Date: Sun Oct 20 09:31:30 MDT 2024
Update Date: 2024-11-04 09:47:08.0
Expiration Date: unknown
Description: Lane Closure~~~Motorists please be advised southbound lanes on US 285 at mm 88 (south of Midway) are closed due to bridge damage from flooding. Northbound lanes will be open for both north and southbound traffic at MM88. Motorists are to reduce speed and proceed with caution.
Post Date: Sun Oct 20 09:31:30 MDT 2024
Update Date: 2024-11-04 09:47:08.0
Expiration Date: unknown
Title: Roadwork, NM 129 at mile marker 0, Newkirk.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Speed has been reduced and motorists can anticipate minor delays.
Post Date: 2024-09-30 08:08:14.0
Update Date: 2024-09-30 08:08:14.0
Expiration Date: unknown
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Speed has been reduced and motorists can anticipate minor delays.
Post Date: 2024-09-30 08:08:14.0
Update Date: 2024-09-30 08:08:14.0
Expiration Date: unknown
Title: Roadwork, US 64 from mile marker 387, 38 miles east of Raton to mile marker 393 Sofia.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Speed has been reduced and motorists can anticipate minor delays.
Post Date: 2024-09-30 08:05:33.0
Update Date: 2024-09-30 08:05:33.0
Expiration Date: unknown
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Speed has been reduced and motorists can anticipate minor delays.
Post Date: 2024-09-30 08:05:33.0
Update Date: 2024-09-30 08:05:33.0
Expiration Date: unknown
Title: Roadwork, NM 28 from mile marker 27, 1 mile north of San Pablo to mile marker 29, 1 mile north of Mesilla.
Description: Roadwork~~~A Mountain Construction (Contractor) will be continuing repairs to the valve and manhole covers along NM 28, known as "Avenida de Mesilla," spanning from Watson Lane to Stern Drive. Drivers should anticipate occasional lane closures as need for these repairs. The contractor will operate from 7 a.m. to 5:30 p.m., Monday through Friday. Starting November 11th, the contractor will be back on site to complete nighttime paving operations.
Post Date: 2024-09-30 07:18:18.0
Update Date: 2024-11-04 14:19:40.143
Expiration Date: unknown
Description: Roadwork~~~A Mountain Construction (Contractor) will be continuing repairs to the valve and manhole covers along NM 28, known as "Avenida de Mesilla," spanning from Watson Lane to Stern Drive. Drivers should anticipate occasional lane closures as need for these repairs. The contractor will operate from 7 a.m. to 5:30 p.m., Monday through Friday. Starting November 11th, the contractor will be back on site to complete nighttime paving operations.
Post Date: 2024-09-30 07:18:18.0
Update Date: 2024-11-04 14:19:40.143
Expiration Date: unknown
Title: Alert, I 10 westbound at mile marker 61, 20 miles west of Deming.
Description: Alert~~~Th Gage Rest Area is closed due to no water available. This closure will be in place until 2025.
Post Date: 2024-10-28 10:01:43.0
Update Date: 2024-11-04 14:19:40.143
Expiration Date: unknown
Description: Alert~~~Th Gage Rest Area is closed due to no water available. This closure will be in place until 2025.
Post Date: 2024-10-28 10:01:43.0
Update Date: 2024-11-04 14:19:40.143
Expiration Date: unknown
Title: Lane Closure, I 40 westbound from mile marker 221, 3 miles east of Clines Corner to mile marker 224, 6 miles east of Clines Corner.
Description: Lane Closure~~~Right lane closer due to road work please use caution while travelling through the area.
Post Date: 2024-10-28 08:45:07.0
Update Date: 2024-10-28 08:45:07.0
Expiration Date: unknown
Description: Lane Closure~~~Right lane closer due to road work please use caution while travelling through the area.
Post Date: 2024-10-28 08:45:07.0
Update Date: 2024-10-28 08:45:07.0
Expiration Date: unknown
Title: Roadwork, US 60 from mile marker 387, 1 mile west of Clovis to mile marker 389, eastside of Clovis. Roadway closed.
Description: Roadwork~~~Road Reconstruction project on US60/84 from MP 387.800 to MP 389.120. Westbound lanes of US 60 closed for reconstruction from Grand St to Prince St. Traffic will be reduced to one lane in each direction on the existing Eastbound Lanes. Traffic will follow posted detour signage and there is a 12ft width restriction. Oversized or wide loads must use the designated truck bypass off of Hall St. Please follow all posted signage be aware of personnel and equipment in the workzone. Project expected completion date is Summer of 2025 depending on weather and delays. Contractor - AUI, Inc.- John Hale 505-974-1613 ; NMDOT PM- Debbie Ysasi 575-291-5208.
Post Date: 2023-07-17 15:32:10.0
Update Date: 2024-10-24 16:34:51.0
Expiration Date: unknown
Description: Roadwork~~~Road Reconstruction project on US60/84 from MP 387.800 to MP 389.120. Westbound lanes of US 60 closed for reconstruction from Grand St to Prince St. Traffic will be reduced to one lane in each direction on the existing Eastbound Lanes. Traffic will follow posted detour signage and there is a 12ft width restriction. Oversized or wide loads must use the designated truck bypass off of Hall St. Please follow all posted signage be aware of personnel and equipment in the workzone. Project expected completion date is Summer of 2025 depending on weather and delays. Contractor - AUI, Inc.- John Hale 505-974-1613 ; NMDOT PM- Debbie Ysasi 575-291-5208.
Post Date: 2023-07-17 15:32:10.0
Update Date: 2024-10-24 16:34:51.0
Expiration Date: unknown
Title: Roadwork, I 25 at mile marker 75, Williamsburg (T OR C SOUTH).
Description: Roadwork~~~El Terrero Construction, LLC. (Contractor) will be continuing construction to replace the bridge at I-25 milepost 75, Broadway Street and NM 187 in Williamsburg. Regular work hours are 7 a.m.-5 p.m. Monday-Friday. Motorists should expect delays and allow extra time to reach their destinations. Motorists should also use extra caution in the construction area. Access will be maintained to all businesses and residences.
Post Date: 2023-01-16 08:55:34.0
Update Date: 2024-11-04 14:19:40.143
Expiration Date: unknown
Description: Roadwork~~~El Terrero Construction, LLC. (Contractor) will be continuing construction to replace the bridge at I-25 milepost 75, Broadway Street and NM 187 in Williamsburg. Regular work hours are 7 a.m.-5 p.m. Monday-Friday. Motorists should expect delays and allow extra time to reach their destinations. Motorists should also use extra caution in the construction area. Access will be maintained to all businesses and residences.
Post Date: 2023-01-16 08:55:34.0
Update Date: 2024-11-04 14:19:40.143
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 384, Tres Piedras to mile marker 392, 8 miles north of Tres Piedras.
Description: Roadwork~~~Construction has begun on a project to improve 8.337 miles of U.S. 285 at Tres Piedras. The project, which extends from milepost 384.051 on the south to milepost 392.308 on the north, is designed to improve safety and includes the following: . • Rehabilitation of the roadway • Widening of the shoulders on both sides to the roadway • Extending the drainage structures near the roadway • Erosion control • New signing and striping of the roadway. Regular work hours will be 6 a.m.-6 p.m. Monday-Thursday and 6 a.m.-2 p.m. Friday although the contractor may work longer hours or weekends as needed. One lane will be closed for the duration of the project and there is a 24-hour flagging operation in place. Please obey all traffic control personnel and proceed with caution through the roadwork zone. **PLEASE NOTE: THERE IS A 10 FOOT WIDTH RESTRICTION IN PLACE!**
Post Date: 2024-07-15 10:25:56.0
Update Date: 2024-10-30 14:14:54.0
Expiration Date: unknown
Description: Roadwork~~~Construction has begun on a project to improve 8.337 miles of U.S. 285 at Tres Piedras. The project, which extends from milepost 384.051 on the south to milepost 392.308 on the north, is designed to improve safety and includes the following: . • Rehabilitation of the roadway • Widening of the shoulders on both sides to the roadway • Extending the drainage structures near the roadway • Erosion control • New signing and striping of the roadway. Regular work hours will be 6 a.m.-6 p.m. Monday-Thursday and 6 a.m.-2 p.m. Friday although the contractor may work longer hours or weekends as needed. One lane will be closed for the duration of the project and there is a 24-hour flagging operation in place. Please obey all traffic control personnel and proceed with caution through the roadwork zone. **PLEASE NOTE: THERE IS A 10 FOOT WIDTH RESTRICTION IN PLACE!**
Post Date: 2024-07-15 10:25:56.0
Update Date: 2024-10-30 14:14:54.0
Expiration Date: unknown
Title: Roadwork, NM 68 from mile marker 44, 1 mile south of Taos to mile marker 45, Taos.
Description: Roadwork~~~ONGOING: Due to unforeseen issues at Martyr’s Lane, Phase 3 construction and the closure of Martyr’s Lane at Paseo del Pueblo have been extended through mid-August, 2024. The following traffic impact will remain in place: • Southbound motorists can use Camino de la Placita to Civic Plaza Drive, Bent Street, or North Plaza as a detour. ACCESS WILL BE MAINTAINED TO ALL BUSINESSES. Regular work hours are Monday-Friday, 7 a.m.-5:30 p.m., although the contractor may work longer hours or on weekends if needed. Crews will be working Monday, July 1-Wednesday, July 3. They will not be working Thursday, July 4 or Friday, July in observance of Independence Day. Barricades will remain in place for safety. For more information, motorists are encouraged to visit www.taosnm6864.com
Post Date: 2020-04-13 07:53:05.0
Update Date: 2024-08-08 14:28:04.0
Expiration Date: unknown
Description: Roadwork~~~ONGOING: Due to unforeseen issues at Martyr’s Lane, Phase 3 construction and the closure of Martyr’s Lane at Paseo del Pueblo have been extended through mid-August, 2024. The following traffic impact will remain in place: • Southbound motorists can use Camino de la Placita to Civic Plaza Drive, Bent Street, or North Plaza as a detour. ACCESS WILL BE MAINTAINED TO ALL BUSINESSES. Regular work hours are Monday-Friday, 7 a.m.-5:30 p.m., although the contractor may work longer hours or on weekends if needed. Crews will be working Monday, July 1-Wednesday, July 3. They will not be working Thursday, July 4 or Friday, July in observance of Independence Day. Barricades will remain in place for safety. For more information, motorists are encouraged to visit www.taosnm6864.com
Post Date: 2020-04-13 07:53:05.0
Update Date: 2024-08-08 14:28:04.0
Expiration Date: unknown
Title: Roadwork, US 70 from mile marker 162 Organ to mile marker 150, Las Cruces.
Description: Roadwork~~~Mesa Verde Enterprises, Inc. (Contractor) will begin final paving operations starting on Saturday and Sunday only (Weekend) during the day hours from 8AM to 8PM from November 2, 2024, to November 20, 2024. Other construction operations (guardrail, striping, etc…) working hours will be from 6 p.m. to 6 a.m., Wednesday through Sunday. Traffic control devices for lane closures and off/on ramp closures will be in place for the safety of our crews and the traveling public during working hours.
Post Date: Mon Apr 08 07:13:01 MDT 2024
Update Date: 2024-11-04 14:19:40.143
Expiration Date: unknown
Description: Roadwork~~~Mesa Verde Enterprises, Inc. (Contractor) will begin final paving operations starting on Saturday and Sunday only (Weekend) during the day hours from 8AM to 8PM from November 2, 2024, to November 20, 2024. Other construction operations (guardrail, striping, etc…) working hours will be from 6 p.m. to 6 a.m., Wednesday through Sunday. Traffic control devices for lane closures and off/on ramp closures will be in place for the safety of our crews and the traveling public during working hours.
Post Date: Mon Apr 08 07:13:01 MDT 2024
Update Date: 2024-11-04 14:19:40.143
Expiration Date: unknown
Title: Closure, NM 536 from mile marker 2 to mile marker 13 Sandia Crest.
Description: Closure~~~New Mexico 536 the Sandia Crest Road is Closed due to winter weather.
Post Date: 2024-11-04 17:35:23.0
Update Date: 2024-11-04 17:35:23.0
Expiration Date: unknown
Description: Closure~~~New Mexico 536 the Sandia Crest Road is Closed due to winter weather.
Post Date: 2024-11-04 17:35:23.0
Update Date: 2024-11-04 17:35:23.0
Expiration Date: unknown
Title: Seasonal Closure, NM 72 from mile marker 0, Raton to mile marker 18, 10 miles east of Yankee. Roadway closed.
Description: Seasonal Closure~~~Roadway will become impassable due to ice, snow, and snow drifts. No roadway maintenance will be performed throughout seasonal closure
Post Date: Mon Nov 04 13:57:03 MST 2024
Update Date: 2024-11-04 14:05:58.0
Expiration Date: unknown
Description: Seasonal Closure~~~Roadway will become impassable due to ice, snow, and snow drifts. No roadway maintenance will be performed throughout seasonal closure
Post Date: Mon Nov 04 13:57:03 MST 2024
Update Date: 2024-11-04 14:05:58.0
Expiration Date: unknown
Title: Difficult Driving Conditions exist in the Tijeras area.
Description: Difficult Driving Conditions - Roads are slushy, snow packed and icy in spots.~~~Please reduce speed and use caution in area. Maintenance crews are out patrolling and treating roadways.
Post Date: Mon Nov 04 08:31:45 MST 2024
Update Date: 2024-11-04 11:27:25.0
Expiration Date: unknown
Description: Difficult Driving Conditions - Roads are slushy, snow packed and icy in spots.~~~Please reduce speed and use caution in area. Maintenance crews are out patrolling and treating roadways.
Post Date: Mon Nov 04 08:31:45 MST 2024
Update Date: 2024-11-04 11:27:25.0
Expiration Date: unknown
Title: Severe Driving, US 64 from mile marker 370, 21 miles east of Raton to mile marker 404 Grenville.
Description: Severe Driving Conditions - Roads are wet with some icy spots. Black ice may exist when temperatures drop. Blowing snow is resulting in low visibility.~~~This event will update as conditions change
Post Date: Mon Nov 04 07:13:16 MST 2024
Update Date: 2024-11-04 09:34:28.0
Expiration Date: unknown
Description: Severe Driving Conditions - Roads are wet with some icy spots. Black ice may exist when temperatures drop. Blowing snow is resulting in low visibility.~~~This event will update as conditions change
Post Date: Mon Nov 04 07:13:16 MST 2024
Update Date: 2024-11-04 09:34:28.0
Expiration Date: unknown
Title: Fair Driving Conditions exist in the Gallina area.
Description: Fair Driving Conditions - Roads are wet and may become slick.~~~Crews are out plowing and sanding. Drive with caution. Please stay behind snowplows at least 50 feet.
Post Date: Mon Nov 04 05:03:10 MST 2024
Update Date: 2024-11-04 16:37:56.0
Expiration Date: unknown
Description: Fair Driving Conditions - Roads are wet and may become slick.~~~Crews are out plowing and sanding. Drive with caution. Please stay behind snowplows at least 50 feet.
Post Date: Mon Nov 04 05:03:10 MST 2024
Update Date: 2024-11-04 16:37:56.0
Expiration Date: unknown
Title: Alert, US 64 from mile marker 6, 6 miles east of Arizona State Line to mile marker 9, 9 miles east of Arizona State Line.
Description: Alert~~~Beginning Monday March 11th, one lane will be closed from 6a.m. until 6p.m. each day, Monday through Friday. The remaining lane will have a width restrict in place of 9' during working hours. Work is expected to be completed by November 20th, 2024. Please obey all traffic control personnel and proceed with caution through the roadwork zone. Expect delays and use caution while travelling through the area.
Post Date: 2024-03-04 14:17:10.0
Update Date: 2024-03-16 01:20:37.0
Expiration Date: unknown
Description: Alert~~~Beginning Monday March 11th, one lane will be closed from 6a.m. until 6p.m. each day, Monday through Friday. The remaining lane will have a width restrict in place of 9' during working hours. Work is expected to be completed by November 20th, 2024. Please obey all traffic control personnel and proceed with caution through the roadwork zone. Expect delays and use caution while travelling through the area.
Post Date: 2024-03-04 14:17:10.0
Update Date: 2024-03-16 01:20:37.0
Expiration Date: unknown
Title: Alert, I 10 at mile marker 20, (LORDSBURG WEST).
Description: Alert~~~The Lordsburg welcome Center and Rest area will be closed until September 2024 for much needed upgrades to the main building, landscaping and restrooms.
Post Date: 2024-06-03 10:54:47.0
Update Date: 2024-11-04 14:19:40.143
Expiration Date: unknown
Description: Alert~~~The Lordsburg welcome Center and Rest area will be closed until September 2024 for much needed upgrades to the main building, landscaping and restrooms.
Post Date: 2024-06-03 10:54:47.0
Update Date: 2024-11-04 14:19:40.143
Expiration Date: unknown
Title: Roadwork, US 64 from mile marker 0, Arizona State Line to mile marker 3 Beclabito.
Description: Roadwork~~~One lane road Use caution when driving through construction area watch for flagmen.
Post Date: 2024-07-01 08:22:39.0
Update Date: 2024-07-08 17:01:51.0
Expiration Date: unknown
Description: Roadwork~~~One lane road Use caution when driving through construction area watch for flagmen.
Post Date: 2024-07-01 08:22:39.0
Update Date: 2024-07-08 17:01:51.0
Expiration Date: unknown
Title: Roadwork, US 54 from mile marker 327 Logan to mile marker 333, 7 miles north of Logan.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Motorists can anticipate minor delays.
Post Date: 2024-08-30 07:09:06.0
Update Date: 2024-08-30 07:09:06.0
Expiration Date: unknown
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Motorists can anticipate minor delays.
Post Date: 2024-08-30 07:09:06.0
Update Date: 2024-08-30 07:09:06.0
Expiration Date: unknown
Title: undefined, I 25 from mile marker 276, (NM 599) to mile marker 302, 18 miles north of Santa Fe.
Description: - Please Select - - Roads are wet and may become slick. Visibility is good with clear skies.~~~Glorieta - Roads are wet at this time.
Post Date: 2019-12-27 22:23:17.0
Update Date: 2019-12-28 13:53:25.0
Expiration Date: unknown
Description: - Please Select - - Roads are wet and may become slick. Visibility is good with clear skies.~~~Glorieta - Roads are wet at this time.
Post Date: 2019-12-27 22:23:17.0
Update Date: 2019-12-28 13:53:25.0
Expiration Date: unknown
Title: Roadwork, I 10 at mile marker 164, Anthony.
Description: Roadwork~~~I-10 Widening West Closures Sunday, November 3, from 9 p.m. to 5 a.m. • I-10 East will be reduced to one lane between Redd Road and Thorn Avenue. Crews will be placing concrete pavement Sunday, November 3, through Tuesday, November 5, 9 p.m. to 5 a.m. • I-10 East and West will be reduced to one lane at Los Mochis Drive Intermittent complete closures of I-10 East and West are possible at this time. Crews will be placing bridge beams. Monday, November 4, through Saturday, November 9, 9 a.m. to 4 p.m. • I-10 East and West will be reduced to one lane between Vinton Road and Transmountain Road as needed. Crews will be working on retaining walls. Monday, November 4, through Saturday, November 9, 9 a.m. to 4 p.m. • I-10 East and West will be reduced to one lane between Mesa Street and Redd Road. Crews will be conducting earth work. Wednesday, November 6, and Thursday, November 7, 9 p.m. to 5 a.m. • I-10 East will be closed at Redd Road DETOUR: Take Exit 9 (Redd Road), continue on South Desert Boulevard, and re-enter I-10 past Mesa Street. Crews will be installing bridge beams. Sunday, November 10, 9 p.m. to 5 a.m. • I-10 West will be closed at Mesa Street DETOUR: Take Exit 11 (SH 20/Mesa Street/Thorn Avenue), continue on North Desert Boulevard, and re-enter I-10 past Redd Road. Crews will be installing bridge beams. Widening Phase 2 Monday, 11/04/24, through Friday, 11/08/24, Daily 9am-4pm • Right lane closure on IH-10 EB from Anthony to Nashua Rd. Crews will be milling and conducting asphalt placement. Thursday, 11/07/24, 9pm-5am • Full closure on IH-10 EB from Anthony NM to Transmountain Rd. Crews will be placing barrier and striping from New Mexico State Line to Anthony TX, All traffic will exit at NM404 (Anthony, NM), turn right on NM404 (Ohara Rd), turn left on NM460 (Anthony Dr), and proceed towards Doniphan Dr, turn left on Vinton Rd, and proceed towards South Desert to re-enter IH-10 EB on the Vinton On-Ramp. Saturday, 11/09/24 at 3am through Monday, 11/11/24 at 6am (51 HRS) • Full closure on IH-10 EB from Anthony TX to Transmountain Rd. Crews will be placing barrier and striping. All traffic to exit at Anthony TX, proceed on South. Desert Blvd through the Anthony and Vinton Intersections, and re-enter IH-10 EB at the Los Mochis on-ramp, (before Transmountain Rd). Future Upcoming Closures Monday, 11/11/24, through Friday, 11/15/24, Daily, 9am-4pm • Right lane closure on IH-10 WB from Nashua Rd to NM State Line. Crews will be milling and conducting asphalt placement. Saturday, 11/16/24, through Monday, 11/18/24, 3AM-6AM (51 HRS) • Full closure on IH-10 WB from Transmountain Rd. to Anthony TX. Crews will be placing barrier and striping. All traffic to exit and proceed on Nth Desert after Los Mochis (PHASE 3), Continue Nth. Desert Blvd through the Vinton and Anthony Intersections, and re-enter IH-10 WB at the Anthony, TX On-Ramp. TXDOT Roadway Closures can be found at www.drivetexas.com.
Post Date: 2024-04-26 15:48:41.0
Update Date: 2024-11-04 14:19:40.143
Expiration Date: unknown
Description: Roadwork~~~I-10 Widening West Closures Sunday, November 3, from 9 p.m. to 5 a.m. • I-10 East will be reduced to one lane between Redd Road and Thorn Avenue. Crews will be placing concrete pavement Sunday, November 3, through Tuesday, November 5, 9 p.m. to 5 a.m. • I-10 East and West will be reduced to one lane at Los Mochis Drive Intermittent complete closures of I-10 East and West are possible at this time. Crews will be placing bridge beams. Monday, November 4, through Saturday, November 9, 9 a.m. to 4 p.m. • I-10 East and West will be reduced to one lane between Vinton Road and Transmountain Road as needed. Crews will be working on retaining walls. Monday, November 4, through Saturday, November 9, 9 a.m. to 4 p.m. • I-10 East and West will be reduced to one lane between Mesa Street and Redd Road. Crews will be conducting earth work. Wednesday, November 6, and Thursday, November 7, 9 p.m. to 5 a.m. • I-10 East will be closed at Redd Road DETOUR: Take Exit 9 (Redd Road), continue on South Desert Boulevard, and re-enter I-10 past Mesa Street. Crews will be installing bridge beams. Sunday, November 10, 9 p.m. to 5 a.m. • I-10 West will be closed at Mesa Street DETOUR: Take Exit 11 (SH 20/Mesa Street/Thorn Avenue), continue on North Desert Boulevard, and re-enter I-10 past Redd Road. Crews will be installing bridge beams. Widening Phase 2 Monday, 11/04/24, through Friday, 11/08/24, Daily 9am-4pm • Right lane closure on IH-10 EB from Anthony to Nashua Rd. Crews will be milling and conducting asphalt placement. Thursday, 11/07/24, 9pm-5am • Full closure on IH-10 EB from Anthony NM to Transmountain Rd. Crews will be placing barrier and striping from New Mexico State Line to Anthony TX, All traffic will exit at NM404 (Anthony, NM), turn right on NM404 (Ohara Rd), turn left on NM460 (Anthony Dr), and proceed towards Doniphan Dr, turn left on Vinton Rd, and proceed towards South Desert to re-enter IH-10 EB on the Vinton On-Ramp. Saturday, 11/09/24 at 3am through Monday, 11/11/24 at 6am (51 HRS) • Full closure on IH-10 EB from Anthony TX to Transmountain Rd. Crews will be placing barrier and striping. All traffic to exit at Anthony TX, proceed on South. Desert Blvd through the Anthony and Vinton Intersections, and re-enter IH-10 EB at the Los Mochis on-ramp, (before Transmountain Rd). Future Upcoming Closures Monday, 11/11/24, through Friday, 11/15/24, Daily, 9am-4pm • Right lane closure on IH-10 WB from Nashua Rd to NM State Line. Crews will be milling and conducting asphalt placement. Saturday, 11/16/24, through Monday, 11/18/24, 3AM-6AM (51 HRS) • Full closure on IH-10 WB from Transmountain Rd. to Anthony TX. Crews will be placing barrier and striping. All traffic to exit and proceed on Nth Desert after Los Mochis (PHASE 3), Continue Nth. Desert Blvd through the Vinton and Anthony Intersections, and re-enter IH-10 WB at the Anthony, TX On-Ramp. TXDOT Roadway Closures can be found at www.drivetexas.com.
Post Date: 2024-04-26 15:48:41.0
Update Date: 2024-11-04 14:19:40.143
Expiration Date: unknown
Title: Roadwork, NM 566 northbound and southbound from mile marker 6, 6 miles north of I-40 to mile marker 7, 7 miles north of I-40.
Description: Roadwork~~~Roadwork on NM 566, mile marker 6-7 (north of Church Rock) due to a bridge replacement project. All traffic has been shifted onto the detour pavement. Speed reduced to 35mph through the work zone. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2023-12-22 09:19:16.0
Update Date: 2023-12-22 09:19:16.0
Expiration Date: unknown
Description: Roadwork~~~Roadwork on NM 566, mile marker 6-7 (north of Church Rock) due to a bridge replacement project. All traffic has been shifted onto the detour pavement. Speed reduced to 35mph through the work zone. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2023-12-22 09:19:16.0
Update Date: 2023-12-22 09:19:16.0
Expiration Date: unknown
Title: Roadwork, I 25 at mile marker 139, San Antonio (US 380/SAN ANTONIO).
Description: Roadwork~~~Kimo Constructors, Inc. (Contractor) will begin working on the bridge on I-25 San Antonio (Walnut Creek milepost 139). This project consists of bridge rehabilitation, erosion control and drainage. The contractor’s hours of operation are 7 a.m. to 5 p.m. Monday through Friday.
Post Date: 2024-06-21 13:32:05.0
Update Date: 2024-11-04 14:19:40.143
Expiration Date: unknown
Description: Roadwork~~~Kimo Constructors, Inc. (Contractor) will begin working on the bridge on I-25 San Antonio (Walnut Creek milepost 139). This project consists of bridge rehabilitation, erosion control and drainage. The contractor’s hours of operation are 7 a.m. to 5 p.m. Monday through Friday.
Post Date: 2024-06-21 13:32:05.0
Update Date: 2024-11-04 14:19:40.143
Expiration Date: unknown
Title: Roadwork, I 25 at mile marker 63, (NM 152/HILLSBORO).
Description: Roadwork~~~Kimo Constructors, Inc. (Contractor) will be continuing work on the bridges on I-25 at Caballo (Green Horn milepost 63). This project consists of bridge rehabilitation, erosion control and drainage. The contractor’s hours of operation are 7 a.m. to 5 p.m. Monday through Friday.
Post Date: 2024-06-21 13:31:27.0
Update Date: 2024-11-04 14:19:40.143
Expiration Date: unknown
Description: Roadwork~~~Kimo Constructors, Inc. (Contractor) will be continuing work on the bridges on I-25 at Caballo (Green Horn milepost 63). This project consists of bridge rehabilitation, erosion control and drainage. The contractor’s hours of operation are 7 a.m. to 5 p.m. Monday through Friday.
Post Date: 2024-06-21 13:31:27.0
Update Date: 2024-11-04 14:19:40.143
Expiration Date: unknown
Title: Closure, NM 539 from mile marker 0 Navajo City to mile marker 5 Navajo Dam.
Description: Closure~~~N.M. 539 will be closed until December 31, 2024 while contractors conduct exploratory drilling at Navajo Dam. Through traffic will be rerouted onto N.M. 511. Expect delays and use caution while travelling through the area.
Post Date: 2024-09-20 08:26:52.0
Update Date: 2024-09-20 08:26:52.0
Expiration Date: 2024-12-31 23:59:00.0
Description: Closure~~~N.M. 539 will be closed until December 31, 2024 while contractors conduct exploratory drilling at Navajo Dam. Through traffic will be rerouted onto N.M. 511. Expect delays and use caution while travelling through the area.
Post Date: 2024-09-20 08:26:52.0
Update Date: 2024-09-20 08:26:52.0
Expiration Date: 2024-12-31 23:59:00.0
Title: Alert, NM 14 from mile marker 28, 1 mile south of Madrid to mile marker 29, Madrid.
Description: Alert~~~Vehicles over 55' in length are prohibited in Madrid N.M.
Post Date: 2023-08-18 16:17:57.0
Update Date: 2024-02-10 19:05:15.0
Expiration Date: unknown
Description: Alert~~~Vehicles over 55' in length are prohibited in Madrid N.M.
Post Date: 2023-08-18 16:17:57.0
Update Date: 2024-02-10 19:05:15.0
Expiration Date: unknown
Title: Roadwork, NM 126 from mile marker 9, 9 miles east of Cuba to mile marker 10, 10 miles east of Cuba.
Description: Roadwork~~~Roadwork on NM 126, mile marker 9-10 (east of Cuba) due to a bridge replacement project. Traffic is down to one lane controlled by traffic signals throughout the work zone. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2024-06-14 09:39:31.0
Update Date: 2024-06-14 09:41:02.0
Expiration Date: unknown
Description: Roadwork~~~Roadwork on NM 126, mile marker 9-10 (east of Cuba) due to a bridge replacement project. Traffic is down to one lane controlled by traffic signals throughout the work zone. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2024-06-14 09:39:31.0
Update Date: 2024-06-14 09:41:02.0
Expiration Date: unknown
Title: Roadwork, NM 146 northbound and southbound from mile marker 0, Hachita to mile marker 19, at I-10.
Description: Roadwork~~~The New Mexico Department of Transportation (NMDOT) will begin “Chip Sealing and Brooming” operations on NM 146. Speed limits will be reduced, no center stripe with loose gravel on roadway. Please expect delays and a pilot car operation.
Post Date: 2024-09-13 09:21:12.0
Update Date: 2024-11-04 14:19:40.143
Expiration Date: unknown
Description: Roadwork~~~The New Mexico Department of Transportation (NMDOT) will begin “Chip Sealing and Brooming” operations on NM 146. Speed limits will be reduced, no center stripe with loose gravel on roadway. Please expect delays and a pilot car operation.
Post Date: 2024-09-13 09:21:12.0
Update Date: 2024-11-04 14:19:40.143
Expiration Date: unknown
Title: Construction Closure, NM 556 eastbound and westbound at mile marker 2, at I-25.
Description: I/25-NM 556 Tramway Blvd MP 3-9 (thru 11/10) There will be lane and shoulder restrictions . Work is being performed for highway maintenance. Motorists should anticipate delays. Contractor: Albuquerque Asphalt NMDOT: Barry Lytle--
Post Date: 2024-09-13 06:47:33.0
Update Date: 2024-09-18 11:55:49.0
Expiration Date: 2024-11-10 23:59:00.0
Description: I/25-NM 556 Tramway Blvd MP 3-9 (thru 11/10) There will be lane and shoulder restrictions . Work is being performed for highway maintenance. Motorists should anticipate delays. Contractor: Albuquerque Asphalt NMDOT: Barry Lytle--
Post Date: 2024-09-13 06:47:33.0
Update Date: 2024-09-18 11:55:49.0
Expiration Date: 2024-11-10 23:59:00.0
Title: Roadwork, NM 566 northbound and southbound at mile marker 0, Church Rock (I-40).
Description: Roadwork~~~Bridge Replacement work on NM 566, mile marker 0 - 0.866 (Church Rock). All traffic has been shifted to the detour pavement. Watch for equipment. This event will be updated as conditions change.
Post Date: 2023-10-13 15:46:41.0
Update Date: 2023-10-13 15:46:41.0
Expiration Date: unknown
Description: Roadwork~~~Bridge Replacement work on NM 566, mile marker 0 - 0.866 (Church Rock). All traffic has been shifted to the detour pavement. Watch for equipment. This event will be updated as conditions change.
Post Date: 2023-10-13 15:46:41.0
Update Date: 2023-10-13 15:46:41.0
Expiration Date: unknown
Title: Roadwork, NM 81 from mile marker 0, Antelope Wells to mile marker 45, Hachita.
Description: Roadwork~~~The New Mexico Department of Transportation (NMDOT) has completed “Chip Sealing and Brooming” operations on NM 81 in and around Animas and Hachita. Crews will begin Fog Sealing operations within the next month. Speed limits will be reduced, no center stripe with loose gravel on roadway.
Post Date: 2024-07-12 14:09:53.0
Update Date: 2024-11-04 14:19:40.143
Expiration Date: unknown
Description: Roadwork~~~The New Mexico Department of Transportation (NMDOT) has completed “Chip Sealing and Brooming” operations on NM 81 in and around Animas and Hachita. Crews will begin Fog Sealing operations within the next month. Speed limits will be reduced, no center stripe with loose gravel on roadway.
Post Date: 2024-07-12 14:09:53.0
Update Date: 2024-11-04 14:19:40.143
Expiration Date: unknown
Title: Roadwork, NM 41 from mile marker 28 to mile marker 38, 1 mile south of Stanley.
Description: Roadwork~~~The New Mexico Department of Transportation along with Brasier Asphalt Inc. will begin a 10-mile pavement rehabilitation project that will include new pavement and striping on Wednesday, September 4, 2024, on N.M. 41 between Moriarty and Stanley. Work will take place from mile marker 28 to 38 and is expected to last 15 working days. Crews will be working six days a week, Monday through Saturday, from 7 a.m. until 7 p.m. One lane will be closed during working hours, there will be a 12-foot width restriction in place, the speed limit will be reduced to 35 miles per hour through the work zone and a pilot car will be in place to guide motorists through the construction zone. At the end of each workday, all traffic control devices will be removed, and the roadway reopened to motorists.
Post Date: 2024-09-06 19:57:34.0
Update Date: 2024-09-06 19:57:34.0
Expiration Date: unknown
Description: Roadwork~~~The New Mexico Department of Transportation along with Brasier Asphalt Inc. will begin a 10-mile pavement rehabilitation project that will include new pavement and striping on Wednesday, September 4, 2024, on N.M. 41 between Moriarty and Stanley. Work will take place from mile marker 28 to 38 and is expected to last 15 working days. Crews will be working six days a week, Monday through Saturday, from 7 a.m. until 7 p.m. One lane will be closed during working hours, there will be a 12-foot width restriction in place, the speed limit will be reduced to 35 miles per hour through the work zone and a pilot car will be in place to guide motorists through the construction zone. At the end of each workday, all traffic control devices will be removed, and the roadway reopened to motorists.
Post Date: 2024-09-06 19:57:34.0
Update Date: 2024-09-06 19:57:34.0
Expiration Date: unknown
Title: Alert, US 380 at mile marker 66, Carrizozo.
Description: Trucks over 65 foot are prohibited on US 380 between Carrizozo and Hondo. This is a PERMANENT ALERT.~~~
Post Date: Fri Jan 06 12:52:40 MST 2017
Update Date: 2024-11-04 09:47:26.0
Expiration Date: unknown
Description: Trucks over 65 foot are prohibited on US 380 between Carrizozo and Hondo. This is a PERMANENT ALERT.~~~
Post Date: Fri Jan 06 12:52:40 MST 2017
Update Date: 2024-11-04 09:47:26.0
Expiration Date: unknown
Title: Roadwork, US 60 from mile marker 384, 2 miles east of Cannon AFB to mile marker 385, 3 miles east of Cannon AFB. Roadway closed.
Description: Roadwork~~~Intersection Improvements at Intersection of US 60/84 & HWY 467 MP 384.312 to MP 384.596. US60/84. All lanes are currently open to traffic until work resumes on traffic signals. Work is expected to be completed spring of 2025 depending on weather and delays. Contractor – K Barnett & Sons Project Manager – Hunter McLemore (214)693-3588 K Barnett & Sons TCS – Hector Guerrero (575)309-5299 ; NMDOT PM- Debbie Ysasi 575-291-5208.
Post Date: 2024-04-05 15:23:47.0
Update Date: 2024-10-24 16:30:21.0
Expiration Date: unknown
Description: Roadwork~~~Intersection Improvements at Intersection of US 60/84 & HWY 467 MP 384.312 to MP 384.596. US60/84. All lanes are currently open to traffic until work resumes on traffic signals. Work is expected to be completed spring of 2025 depending on weather and delays. Contractor – K Barnett & Sons Project Manager – Hunter McLemore (214)693-3588 K Barnett & Sons TCS – Hector Guerrero (575)309-5299 ; NMDOT PM- Debbie Ysasi 575-291-5208.
Post Date: 2024-04-05 15:23:47.0
Update Date: 2024-10-24 16:30:21.0
Expiration Date: unknown
Title: Roadwork, US 285 northbound and southbound at mile marker 55, Lakewood.
Description: Roadwork~~~Bridge Repair operations will begin October 7, 2024 on US 285 at 55 (Lakewood). Motorists should expect both northbound and southbound inside lane closures throughout the duration of the project and working hours of 7:00 a.m. to 5:00 p.m. Monday thru Friday. Work is expected to be completed the first part of December 2024, weather permitting. Please use caution, reduce speed, and watch for all personnel and equipment in the area. Contractor: Hasse Construction; NMDOT: Contact 575-840-3035.
Post Date: 2024-10-04 13:02:06.0
Update Date: 2024-10-04 13:02:06.0
Expiration Date: unknown
Description: Roadwork~~~Bridge Repair operations will begin October 7, 2024 on US 285 at 55 (Lakewood). Motorists should expect both northbound and southbound inside lane closures throughout the duration of the project and working hours of 7:00 a.m. to 5:00 p.m. Monday thru Friday. Work is expected to be completed the first part of December 2024, weather permitting. Please use caution, reduce speed, and watch for all personnel and equipment in the area. Contractor: Hasse Construction; NMDOT: Contact 575-840-3035.
Post Date: 2024-10-04 13:02:06.0
Update Date: 2024-10-04 13:02:06.0
Expiration Date: unknown
Title: Roadwork, US 82 from mile marker 171 Lovington to mile marker 172, Lovington. Roadway closed.
Description: Roadwork~~~Construction for NM83/ US82/ and NM18 in the City of Lovington will take place between Milepost 71.98 to 72.13 for NM 18; between MP 171.37 to MP 172.10 US82 north; MP 171.34 to 171.37 US 82 West; and MP 0.00 to 0.48 on NM83. Commercial trucks are to use the bypasses around the city. On US82 from Tatum there is a truck bypass at MP 173. On US82 from Artesia there is a truck route at MP170 that goes to Hobbs on the right and to Tatum on the left. US82 from Texas the truck bypass is on Commercial. From Hobbs, take a left on Urlacher. The intersection of NM 83/82 has been reopened for east, west, and southbound traffic. Northbound traffic is closed from the Central to Jefferson. Use posted detour signs to navigate through construction. Obey all traffic and speed signs, and use caution while driving. Detours are set up for the road work there will be a restriction of 10 feet in width on the project. Construction for the project is scheduled to last an estimated 588 working days. Traffic Control is currently set up in Lovington. Traffic Control has been set up on US 82 Going east. Obey all traffic posting throughout the project. The intent of this project is to reconstruct existing concrete and asphalt paving, curb and gutter, ADA curb ramps, sidewalk, drive pads, storm drainage improvements, lighting, signal equipment replacement, signing, pavement markings and to provide construction traffic control for vehicles and pedestrians. Emergency Contact List for the 2101381R2 project: Contractor: Constructors, Inc., Project Manager- Darin Coslin (575) 626-1140, Superintendent- Hector Sicre (915)316-7732. Traffic Control Supervisor- Javier Cannon (915) 888-7144, Project Safety Office- Tami Mandel (505) 697-1787- Project EEO Officer- Kelly Hicks (575) 302-8408 NMDOT Project Manager John Lara (575) 840-9625, Hobbs Project Office (575) 973-0245.
Post Date: 2021-09-03 10:43:53.0
Update Date: 2024-10-03 16:12:52.0
Expiration Date: unknown
Description: Roadwork~~~Construction for NM83/ US82/ and NM18 in the City of Lovington will take place between Milepost 71.98 to 72.13 for NM 18; between MP 171.37 to MP 172.10 US82 north; MP 171.34 to 171.37 US 82 West; and MP 0.00 to 0.48 on NM83. Commercial trucks are to use the bypasses around the city. On US82 from Tatum there is a truck bypass at MP 173. On US82 from Artesia there is a truck route at MP170 that goes to Hobbs on the right and to Tatum on the left. US82 from Texas the truck bypass is on Commercial. From Hobbs, take a left on Urlacher. The intersection of NM 83/82 has been reopened for east, west, and southbound traffic. Northbound traffic is closed from the Central to Jefferson. Use posted detour signs to navigate through construction. Obey all traffic and speed signs, and use caution while driving. Detours are set up for the road work there will be a restriction of 10 feet in width on the project. Construction for the project is scheduled to last an estimated 588 working days. Traffic Control is currently set up in Lovington. Traffic Control has been set up on US 82 Going east. Obey all traffic posting throughout the project. The intent of this project is to reconstruct existing concrete and asphalt paving, curb and gutter, ADA curb ramps, sidewalk, drive pads, storm drainage improvements, lighting, signal equipment replacement, signing, pavement markings and to provide construction traffic control for vehicles and pedestrians. Emergency Contact List for the 2101381R2 project: Contractor: Constructors, Inc., Project Manager- Darin Coslin (575) 626-1140, Superintendent- Hector Sicre (915)316-7732. Traffic Control Supervisor- Javier Cannon (915) 888-7144, Project Safety Office- Tami Mandel (505) 697-1787- Project EEO Officer- Kelly Hicks (575) 302-8408 NMDOT Project Manager John Lara (575) 840-9625, Hobbs Project Office (575) 973-0245.
Post Date: 2021-09-03 10:43:53.0
Update Date: 2024-10-03 16:12:52.0
Expiration Date: unknown
Title: Roadwork, NM 9 from mile marker 8, 5 miles west of Animas to mile marker 44, Hachita.
Description: Roadwork~~~The New Mexico Department of Transportation (NMDOT) has completed “Chip Sealing and Brooming” operations on NM 9 in and around Animas and Hachita. Crews will begin Fog Sealing operations within the next month. Speed limits will be reduced, no center stripe with loose gravel on roadway.
Post Date: 2024-05-03 15:02:44.0
Update Date: 2024-11-04 14:19:40.143
Expiration Date: unknown
Description: Roadwork~~~The New Mexico Department of Transportation (NMDOT) has completed “Chip Sealing and Brooming” operations on NM 9 in and around Animas and Hachita. Crews will begin Fog Sealing operations within the next month. Speed limits will be reduced, no center stripe with loose gravel on roadway.
Post Date: 2024-05-03 15:02:44.0
Update Date: 2024-11-04 14:19:40.143
Expiration Date: unknown
Title: Alert, NM 152 from mile marker 15, San Lorenzo to mile marker 49, 1 mile east of Hillsboro.
Description: Alert~~~NM 152 between San Lorenzo and Kingston has STEEP GRADES AND NUMEROUS TIGHT TURNS. Trucks without retarder brakes and/or longer than 40 feet in length are PROHIBITED on this section of NM 152. Consider using an alternate route - NM 26 to US 180 or US 60 to NM 12 to US 180. THIS IS A PERMANENT ALERT.
Post Date: 2023-03-03 14:03:42.0
Update Date: 2024-11-04 14:19:40.143
Expiration Date: unknown
Description: Alert~~~NM 152 between San Lorenzo and Kingston has STEEP GRADES AND NUMEROUS TIGHT TURNS. Trucks without retarder brakes and/or longer than 40 feet in length are PROHIBITED on this section of NM 152. Consider using an alternate route - NM 26 to US 180 or US 60 to NM 12 to US 180. THIS IS A PERMANENT ALERT.
Post Date: 2023-03-03 14:03:42.0
Update Date: 2024-11-04 14:19:40.143
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 6, 6 miles north of TX State Line to mile marker 17, 1 mile north of Malaga. Roadway closed.
Description: Roadwork~~~FNF Construction will be reconstructing the roadway, working on bridge rehab and extending drainage structures. Expect lane closures and some delays. There is a 12 foot restriction the entire corridor. WIDE LOADS SHOULD SEEK ALTERNATE ROUTE. Contact Information: FNF Project Manager - Greg Williams 480-290-0383 cell. FNF Traffic Control Supervisor - Christian Day 480-305-4872 cell. NMDOT Project Manager - Juan Salas 575-626-9882
Post Date: 2022-06-03 07:40:05.0
Update Date: 2024-07-12 10:37:42.0
Expiration Date: unknown
Description: Roadwork~~~FNF Construction will be reconstructing the roadway, working on bridge rehab and extending drainage structures. Expect lane closures and some delays. There is a 12 foot restriction the entire corridor. WIDE LOADS SHOULD SEEK ALTERNATE ROUTE. Contact Information: FNF Project Manager - Greg Williams 480-290-0383 cell. FNF Traffic Control Supervisor - Christian Day 480-305-4872 cell. NMDOT Project Manager - Juan Salas 575-626-9882
Post Date: 2022-06-03 07:40:05.0
Update Date: 2024-07-12 10:37:42.0
Expiration Date: unknown
Title: Roadwork, I 25 at mile marker 35, (RINCON).
Description: Roadwork~~~Kimo Constructors, Inc. (Contractor) will begin work on erosion control along I-25 between Rincon and Hatch. The contractor will be working on the southbound off ramp and Rincon (exit 35) and near milepost 43, I-25 may be reduced to a single lane depending on the work location, drivers should be vigilant for construction signing. The contractor’s hours of operation are 7 a.m. to 5 p.m. Monday through Friday.
Post Date: 2024-02-02 15:08:46.0
Update Date: 2024-11-04 14:19:40.143
Expiration Date: unknown
Description: Roadwork~~~Kimo Constructors, Inc. (Contractor) will begin work on erosion control along I-25 between Rincon and Hatch. The contractor will be working on the southbound off ramp and Rincon (exit 35) and near milepost 43, I-25 may be reduced to a single lane depending on the work location, drivers should be vigilant for construction signing. The contractor’s hours of operation are 7 a.m. to 5 p.m. Monday through Friday.
Post Date: 2024-02-02 15:08:46.0
Update Date: 2024-11-04 14:19:40.143
Expiration Date: unknown
For official NM traffic info visit: New Mexico DOT Traffic Site
Tweets by ABQTraffic
Currently
30°F |
30.07in
Barometer 84%
Humidity Northwest 8.1mph Wind |
|
Fair |