Lordsburg Traffic and Road Conditions

Lordsburg Traffic Map

Loading Map
No Traffic Flow? Choose Live Map then Zoom in Closer
Get our app on Google Play

How to use the Lordsburg Traffic Map

Traffic flow lines: Red/White dashed lines = Closed Road, Grey/White dashed lines = Road Work, Red lines = Heavy traffic flow, Yellow/Orange lines = Medium flow and Green = normal traffic. Black lines or No traffic flow lines could indicate a closed road, but in most cases it means that either there is not enough vehicle flow to register or traffic isn't monitored. Also, If you do not see traffic flow, you can zoom in closer to reveal localized data. If you are unable to pan the map, press here (to focus off of the map) and try again.

Traffic Incidents (beta): Each image represents traffic event or incident such as road construction, closure (red circle with a white dash) or accident.

Lordsburg Traffic Alerts

Title: Lane Closure, US 64 from mile marker 242, 12 miles west of Taos to mile marker 243, 11 miles west of Taos.
Description: Lane Closure~~~The New Mexico Department of Transportation, in conjunction with Ulteig Engineers, Inc., will begin performing a routine inspection of the Rio Grande Gorge Bridge beginning Friday October 25, 2024. *** Ulteig employees will be working 7 days a week, except holidays, during daylight hours. While they are working, the speed limit across the bridge will be reduced to 35 mph. One lane will be closed to traffic during working hours and a flagging operation will be in place to allow motorists to safely pass through the work zone. All traffic control devices will be removed at the end of the workday and the bridge reopened to traffic. *** The inspection is expected to be completed by December 31, 2024. *** Drivers are urged to watch out for workers in the area, observe traffic control signs and reduce speed to the posted speed limit.
Post Date: 2024-10-30 13:25:04.0
Update Date: 2024-11-07 21:37:24.348
Expiration Date: 2024-12-31 17:01:00.0
Title: Roadwork, I 40 eastbound and westbound from mile marker 255, 18 miles west of Santa Rosa to mile marker 263, (SAN IGNACIO). Left lane closed.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions.
Post Date: 2024-10-23 07:37:05.0
Update Date: 2024-11-04 19:48:52.639
Expiration Date: unknown
Title: Alert, Alert
Description: Alert~~~Due to road construction in Colorado, CDOT has instituted a 10 foot width restriction on U.S. 84 until further notice.
Post Date: 2024-07-17 15:50:14.0
Update Date: 2024-11-07 21:37:24.348
Expiration Date: unknown
Title: Roadwork, I 25 from mile marker 227, (Comanche) to mile marker 228, (MONTGOMERY).
Description: Roadwork~~~Roadwork, I-25 Improved, Comanche to Montgomery (MP 226-229) Drivers should anticipate lane reductions on I-25 and the local streets, and lane closures during off peak hours (outside of typical commute hours and weekends) In order to complete this large project on schedule, crews will be working day and night and up to seven days each week. I-25 travel lanes in the work zone will shift the median in August. Visit the project website at i25improved.com for more info. Call the team with questions at 505-785-7623 or email at info@I25improved.com Contractor: AUI Inc. Project Number: A301901 NMDOT: William Rose
Post Date: 2024-08-07 11:57:32.0
Update Date: 2024-08-07 12:04:16.0
Expiration Date: unknown
Title: Difficult Driving Conditions exist in the Encino area.
Description: Difficult Driving Conditions - Roads are snow packed and icy.~~~Crews are out salting and sanding. Drive with caution. Please stay behind snowplows at least 50 feet
Post Date: Wed Nov 06 18:40:32 MST 2024
Update Date: 2024-11-08 15:09:51.226
Expiration Date: unknown
Title: Roadwork, I 25 from mile marker 305, 21 miles north of Santa Fe to mile marker 309, 25 miles north of Santa Fe.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions along with a reduced speed throughout the construction zone.
Post Date: 2024-05-01 10:35:11.0
Update Date: 2024-11-04 19:48:52.639
Expiration Date: unknown
Title: Construction Closure, NM 1 westbound at mile marker 0, Elephant Butte.
Description: Construction Closure~~~NM 1 westbound lane at milepost 0 will be closed due to bridge repairs. Motorists are asked to reduce speed, obey posted signs, and be cautious of personnel and equipment in the areas listed below. These closures will remain in place until repairs can be made.
Post Date: 2024-10-29 17:45:01.0
Update Date: 2024-11-08 14:57:28.233
Expiration Date: unknown
Title: Lane Closure, I 25 northbound at mile marker 92, (MITCHELL POINT).
Description: Lane Closure~~~I-25 northbound driving lane will be closed at milepost 92(Mitchell Point) and NM 1 westbound lane at milepost 0 will be closed due to roadway repairs. Motorists are asked to reduce speed, obey posted signs, and be cautious of personnel and equipment in the areas listed below. These closures will remain in place until repairs can be made.
Post Date: 2024-10-29 17:44:21.0
Update Date: 2024-11-08 14:57:28.233
Expiration Date: unknown
Title: Roadwork, US 64 from mile marker 273, 13 miles west of Eagle Nest to mile marker 276, 10 miles west of Eagle Nest. Left lane closed.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. A 10ft width and 55 length (bumper to bumper) restriction is in place for this phase of construction. Motorist can anticipate delays.
Post Date: 2024-06-25 11:01:43.0
Update Date: 2024-11-04 19:48:52.639
Expiration Date: unknown
Title: Roadwork, NM 39 from mile marker 14, 10 miles south of Gallegos to mile marker 19, 5 miles south of Gallegos. Left lane and left shoulder closed.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Speed has been reduced to 40 mph. Motorists can anticipate minor delays.
Post Date: 2024-10-22 09:57:25.0
Update Date: 2024-11-04 19:48:52.639
Expiration Date: unknown
Title: Conditions exist in the Taos area.
Description: Please Select~~~Crews are out salting and sanding. Drive with caution. Please stay behind snowplows at least 50 feet.
Post Date: 2022-02-22 12:16:48.0
Update Date: 2022-02-22 18:28:52.0
Expiration Date: unknown
Title: undefined, US 64 from mile marker 266, 12 miles east of Taos to mile marker 272, 14 miles west of Eagle Nest.
Description: Please Select~~~
Post Date: 2022-02-22 05:18:04.0
Update Date: 2022-02-22 19:43:56.0
Expiration Date: unknown
Title: Roadwork, US 54 from mile marker 151, 19 miles south of Corona to mile marker 163, 7 miles south of Corona.
Description: Roadwork~~~New Roadway construction to include drainage structures is underway between MP 151.6 and MP 163.7 (south of Corona) on US 54. Motorists should obey all construction signing and watch for construction personnel and equipment in the area. Speed limit has been reduced to 45 MPH in the construction zone. Lanes are to remain open for traffic during this phase of the project. Project is scheduled to be finished in Fall of 2024. NMDOT Project Manager, Arron Clark (575)626-9817; Contractor, FNF Construction Inc., Project Manager, Rob Woods (602) 989-1692; Traffic Control Supervisor, David Hernandez (575) 800-4663.
Post Date: 2023-04-18 12:53:43.0
Update Date: 2024-07-12 10:30:03.0
Expiration Date: unknown
Title: Roadwork, NM 68 from mile marker 4, 3 miles south of Alcalde to mile marker 12, 2 miles south of Velarde.
Description: Roadwork~~~There will be intermittent lane closures and traffic switches during this time as construction progresses. This project is scheduled for completion in the fall of 2024. Please obey all traffic control personnel and proceed with caution through the roadwork zone. Expect delays and use caution while travelling through the area.
Post Date: 2020-09-15 10:02:28.0
Update Date: 2024-11-07 21:37:24.348
Expiration Date: unknown
Title: Roadwork, I 25 from mile marker 140, 7 miles south of Socorro to mile marker 150, (SOCORRO NORTH).
Description: Roadwork~~~Mountain States Constructors, Inc. (Contractor) will be finalizing the roadway rehabilitation project on Interstate 25 from milepost 140 (Socorro South) to milepost 150 (Socorro North). Contractor will be placing the top layer of pavement, striping and signage. Please use caution for large slow-moving equipment exiting and entering the roadway. The subcontractors are continuing with the replacement of guardrail on the northbound lanes and at exit 147. Overnight lane closures may remain in place as needed. The contractor’s hours of operation will be from 6 a.m. to 6 p.m., Monday through Friday.
Post Date: Tue Jun 11 16:55:55 MDT 2024
Update Date: 2024-11-08 14:57:28.233
Expiration Date: unknown
Title: Roadwork, NM 434 from mile marker 21, 5 miles south of Black Lake to mile marker 24, 2 miles south of Black Lake.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions along with a reduced speed throughout the construction zone. A 10ft width and 55ft length restriction is in place for this project.
Post Date: 2024-05-07 07:42:17.0
Update Date: 2024-11-04 19:48:52.639
Expiration Date: unknown
Title: Roadwork, I 25 from mile marker 454, Raton to mile marker 460, (RATON PASS/PORT OF ENTRY).
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. A 12 ft. width restriction is in place and speed has been reduced to 55 mph. Motorists can anticipate minor delays.
Post Date: 2024-05-07 07:37:27.0
Update Date: 2024-11-04 19:48:52.639
Expiration Date: unknown
Title: Alert, NM 42 from mile marker 0 , Corona to mile marker 35 , Willard.
Description: Alert~~~N.M. 42 will be closed intermittently to allow vehicles carrying wind turbine blades to safely access the roadway. Expect delays and use caution while travelling through the area.
Post Date: 2024-08-06 07:34:33.0
Update Date: 2024-11-07 21:37:24.348
Expiration Date: unknown
Title: Construction Closure,
Description: Closure, Montgomery Blvd. Loop Ramp 9/3. The westbound Montgomery Boulevard loop ramp to southbound I-25 in Albuquerque will be permanently closed starting the night of 9/3. Drivers will turn left from Montgomery Boulevard onto the frontage road to access southbound I-25. An additional left-turn lane will be added to accommodate the increase in traffic turning left. Visit the project website at i25improved.com for a map and more information. Call the team at 505-785-7623 or email them at info@i25improved.com with any questions. Contractor: AUI Inc. Project Number: A301901 NMDOT: William Rose
Post Date: 2024-09-03 08:26:35.0
Update Date: 2024-09-03 08:26:35.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 16, Malaga to mile marker 17, 1 mile north of Malaga. Left lane and left shoulder closed.
Description: Roadwork~~~Roadwork~~Roadway and Bridge Replacement Construction is underway on US 285 between MP 16.390 to MP 17.757. Motorists can expect a one lane closure with pilot car. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. The Maximum Posted Speed Limit during construction will be 45 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. This Project is 450 working days. Expected completion date is to be determined at a future date. Be aware of multiple construction operations taking place throughout the construction corridor. Contractor: Constructors Inc- Superintendent, Jose Louis Samaniega (915) 262-7475; Traffic Control Supervisor- Francisco Rodriguez (915) 540-2938; NMDOT Project Manager- Juan Salas 575-626-9882
Post Date: 2022-03-31 08:38:54.0
Update Date: 2023-08-01 12:03:57.0
Expiration Date: unknown
Title: Roadwork, US 60 northbound and southbound from mile marker 186, 5 miles east of Cannon AFB to mile marker 188, 7 miles east of Cannon AFB.
Description: Roadwork~~~The NMDOT and FNF Construction will begin a bridge replacement project on U.S. 60 south of Mountainair on April 24, 2023. The project will be in Socorro County between mile post 186.92 and 187.73. Motorists traveling on this section of US 60 should expect delays and allow extra time to reach their destinations. They should also use extreme caution in the construction zone and obey any posted speed limits.
Post Date: 2024-07-18 12:53:53.0
Update Date: 2024-11-08 14:57:28.233
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 17, 1 mile north of Malaga to mile marker 21, Loving.
Description: Roadwork~~~Roadwork Construction is underway on US 285 between MP 17.386 to MP 21.974. Motorists can expect a one lane closure with pilot car. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. The Maximum Posted Speed Limit during construction will be 45 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. This Project is 450 working days. Expected completion date is to be determined at a future date. Be aware of multiple construction operations taking place throughout the construction corridor. Contractor: Constructors Inc- Superintendent, Jose Louis Samaniega (915) 262-7475; Traffic Control Supervisor- Francisco Rodriguez (915) 540-2938; NMDOT Project Manager- Brian Torres 575-626-4278.
Post Date: 2020-08-13 14:57:21.0
Update Date: 2024-07-12 10:41:28.0
Expiration Date: unknown
Title: Alert, NM 104 from mile marker 70, 1 mile east of Mesa Rica to mile marker 90, 15 miles east of Conchas. Roadway closed.
Description: Alert~~~Bridge NO. 5995 at mile marker 71.5, Bridge No. 5254 at mile marker 81.8 and Bridge No. 5257 at mile marker 87.2 all have weight restrictions of 25 tons. Please seek alternate route.
Post Date: 2024-01-11 10:09:46.0
Update Date: 2024-11-04 19:48:52.639
Expiration Date: unknown
Title: Roadwork, US 64 from mile marker 323, 13 miles west of Raton to mile marker 330, 16 miles west of Raton. Left lane closed.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Speed has been reduced and motorists can anticipate minor delays.
Post Date: 2024-08-08 08:52:25.0
Update Date: 2024-11-04 19:48:52.639
Expiration Date: unknown
Title: Severe Driving Conditions exist in the Clines Corners area.
Description: Severe Driving Conditions - Roads are snow packed and icy.~~~Crews are out salting and sanding. Drive with caution. Please stay behind snowplows at least 50 feet
Post Date: 2024-11-07 01:28:28.0
Update Date: 2024-11-08 15:09:51.226
Expiration Date: unknown
Title: Roadwork, I 40 from mile marker 344, 8 miles east of Tucumacari to mile marker 350, 14 miles east of Tucumacari.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Speed has been reduced and motorists can anticipate minor delays.
Post Date: 2024-06-06 07:27:00.0
Update Date: 2024-11-04 19:48:52.639
Expiration Date: unknown
Title: Alert, US 380 at mile marker 43, 13 miles east of Bingham.
Description: Alert~~~White Sands Missile Range periodically has missile firings over US 70 and/or US 380. During the firings the road or roads will be temporarily closed. Please call 575-678-1178 or 575-678-2222 for daily information on possible closure dates and times for firings. THIS IS A PERMANENT ALERT.
Post Date: Thu Jul 01 08:53:50 MDT 2021
Update Date: 2024-11-08 14:57:28.233
Expiration Date: unknown
Title: Lane Closure, NM 502 westbound from mile marker 12, 3 miles east of El Rancho to mile marker 13, 2 miles east of El Rancho.
Description: Lane Closure~~~The right lane will be closed from 7:30a.m. until 5p.m., Monday through Thursday, while utility contractors work in the shoulder area. All traffic control devices will be removed at the end of the workday and the lane reopened to motorists. Please obey all traffic control personnel and proceed with caution through the roadwork zone. Expect delays and use caution while travelling through the area.
Post Date: 2024-11-03 16:54:33.0
Update Date: 2024-11-07 21:37:24.348
Expiration Date: unknown
Title: Roadwork, NM 129 at mile marker 0, Newkirk.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Speed has been reduced and motorists can anticipate minor delays.
Post Date: 2024-09-30 08:08:14.0
Update Date: 2024-11-04 19:48:52.639
Expiration Date: unknown
Title: Roadwork, US 64 from mile marker 387, 38 miles east of Raton to mile marker 393 Sofia.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Speed has been reduced and motorists can anticipate minor delays.
Post Date: 2024-09-30 08:05:33.0
Update Date: 2024-11-04 19:48:52.639
Expiration Date: unknown
Title: Alert, I 10 westbound at mile marker 61, 20 miles west of Deming.
Description: Alert~~~Th Gage Rest Area is closed due to no water available. This closure will be in place until 2025.
Post Date: 2024-10-28 10:01:43.0
Update Date: 2024-11-08 14:57:28.233
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 384, Tres Piedras to mile marker 392, 8 miles north of Tres Piedras.
Description: Roadwork~~~Construction has begun on a project to improve 8.337 miles of U.S. 285 at Tres Piedras. The project, which extends from milepost 384.051 on the south to milepost 392.308 on the north, is designed to improve safety and includes the following: . • Rehabilitation of the roadway • Widening of the shoulders on both sides to the roadway • Extending the drainage structures near the roadway • Erosion control • New signing and striping of the roadway. Regular work hours will be 6 a.m.-6 p.m. Monday-Thursday and 6 a.m.-2 p.m. Friday although the contractor may work longer hours or weekends as needed. One lane will be closed for the duration of the project and there is a 24-hour flagging operation in place. Please obey all traffic control personnel and proceed with caution through the roadwork zone. **PLEASE NOTE: THERE IS A 10 FOOT WIDTH RESTRICTION IN PLACE!**
Post Date: 2024-07-15 10:25:56.0
Update Date: 2024-11-07 21:37:24.348
Expiration Date: unknown
Title: Roadwork, NM 68 from mile marker 44, 1 mile south of Taos to mile marker 45, Taos.
Description: Roadwork~~~ONGOING: Due to unforeseen issues at Martyr’s Lane, Phase 3 construction and the closure of Martyr’s Lane at Paseo del Pueblo have been extended through mid-August, 2024. The following traffic impact will remain in place: • Southbound motorists can use Camino de la Placita to Civic Plaza Drive, Bent Street, or North Plaza as a detour. ACCESS WILL BE MAINTAINED TO ALL BUSINESSES. Regular work hours are Monday-Friday, 7 a.m.-5:30 p.m., although the contractor may work longer hours or on weekends if needed. Crews will be working Monday, July 1-Wednesday, July 3. They will not be working Thursday, July 4 or Friday, July in observance of Independence Day. Barricades will remain in place for safety. For more information, motorists are encouraged to visit www.taosnm6864.com
Post Date: 2020-04-13 07:53:05.0
Update Date: 2024-11-07 21:37:24.348
Expiration Date: unknown
Title: Seasonal Closure, NM 72 from mile marker 5, 3 miles west of Yankee to mile marker 18, 10 miles east of Yankee. Roadway closed.
Description: Seasonal Closure~~~Road closed to through traffic. The roadway will become impassable due to ice, snow, and snow drifts. No roadway maintenance will be performed throughout the seasonal closure.
Post Date: Mon Nov 04 13:57:03 MST 2024
Update Date: 2024-11-06 08:43:24.0
Expiration Date: unknown
Title: Alert, US 64 from mile marker 6, 6 miles east of Arizona State Line to mile marker 9, 9 miles east of Arizona State Line.
Description: Alert~~~Beginning Monday March 11th, one lane will be closed from 6a.m. until 6p.m. each day, Monday through Friday. The remaining lane will have a width restrict in place of 9' during working hours. Work is expected to be completed by November 20th, 2024. Please obey all traffic control personnel and proceed with caution through the roadwork zone. Expect delays and use caution while travelling through the area.
Post Date: 2024-03-04 14:17:10.0
Update Date: 2024-11-07 21:37:24.348
Expiration Date: unknown
Title: Alert, I 10 at mile marker 20, (LORDSBURG WEST).
Description: Alert~~~The Lordsburg welcome Center and Rest area will be closed until September 2024 for much needed upgrades to the main building, landscaping and restrooms.
Post Date: 2024-06-03 10:54:47.0
Update Date: 2024-11-08 14:57:28.233
Expiration Date: unknown
Title: Roadwork, US 64 from mile marker 0, Arizona State Line to mile marker 3 Beclabito.
Description: Roadwork~~~One lane road Use caution when driving through construction area watch for flagmen.
Post Date: 2024-07-01 08:22:39.0
Update Date: 2024-11-07 21:37:24.348
Expiration Date: unknown
Title: Construction Closure,
Description: NM 45, NM 314, NM 317 realignment MP 0 @ (thru 10/31 Phased) There will be continuous lane and shoulder restrictions. Work is being performed for highway reconstruction. Motorists should anticipate delays. Contractor: AUI Inc Project A301088 NMDOT: Tim Chavez
Post Date: Fri Aug 30 09:29:37 MDT 2024
Update Date: 2024-11-06 11:58:10.0
Expiration Date: Tue Dec 31 23:59:00 MST 2024
Title: Roadwork, US 54 from mile marker 327 Logan to mile marker 333, 7 miles north of Logan.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Motorists can anticipate minor delays.
Post Date: 2024-08-30 07:09:06.0
Update Date: 2024-11-04 19:48:52.639
Expiration Date: unknown
Title: undefined, I 25 from mile marker 276, (NM 599) to mile marker 302, 18 miles north of Santa Fe.
Description: - Please Select - - Roads are wet and may become slick. Visibility is good with clear skies.~~~Glorieta - Roads are wet at this time.
Post Date: 2019-12-27 22:23:17.0
Update Date: 2019-12-28 13:53:25.0
Expiration Date: unknown
Title: Roadwork, NM 566 northbound and southbound from mile marker 6, 6 miles north of I-40 to mile marker 7, 7 miles north of I-40.
Description: Roadwork~~~Roadwork on NM 566, mile marker 6-7 (north of Church Rock) due to a bridge replacement project. All traffic has been shifted onto the detour pavement. Speed reduced to 35mph through the work zone. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2023-12-22 09:19:16.0
Update Date: 2023-12-22 09:19:16.0
Expiration Date: unknown
Title: Roadwork, I 25 at mile marker 139, San Antonio (US 380/SAN ANTONIO).
Description: Roadwork~~~Kimo Constructors, Inc. (Contractor) will begin working on the bridge on I-25 San Antonio (Walnut Creek milepost 139). This project consists of bridge rehabilitation, erosion control and drainage. The contractor’s hours of operation are 7 a.m. to 5 p.m. Monday through Friday.
Post Date: 2024-06-21 13:32:05.0
Update Date: 2024-11-08 14:57:28.233
Expiration Date: unknown
Title: Roadwork, I 25 at mile marker 63, (NM 152/HILLSBORO).
Description: Roadwork~~~Kimo Constructors, Inc. (Contractor) will be continuing work on the bridges on I-25 at Caballo (Green Horn milepost 63). This project consists of bridge rehabilitation, erosion control and drainage. The contractor’s hours of operation are 7 a.m. to 5 p.m. Monday through Friday.
Post Date: 2024-06-21 13:31:27.0
Update Date: 2024-11-08 14:57:28.233
Expiration Date: unknown
Title: Closure, NM 539 from mile marker 0 Navajo City to mile marker 5 Navajo Dam.
Description: Closure~~~N.M. 539 will be closed until December 31, 2024 while contractors conduct exploratory drilling at Navajo Dam. Through traffic will be rerouted onto N.M. 511. Expect delays and use caution while travelling through the area.
Post Date: 2024-09-20 08:26:52.0
Update Date: 2024-11-07 21:37:24.348
Expiration Date: 2024-12-31 23:59:00.0
Title: Alert, NM 14 from mile marker 28, 1 mile south of Madrid to mile marker 29, Madrid.
Description: Alert~~~Vehicles over 55' in length are prohibited in Madrid N.M.
Post Date: 2023-08-18 16:17:57.0
Update Date: 2024-11-07 21:37:24.348
Expiration Date: unknown
Title: Roadwork, NM 126 from mile marker 9, 9 miles east of Cuba to mile marker 10, 10 miles east of Cuba.
Description: Roadwork~~~Roadwork on NM 126, mile marker 9-10 (east of Cuba) due to a bridge replacement project. Traffic is down to one lane controlled by traffic signals throughout the work zone. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2024-06-14 09:39:31.0
Update Date: 2024-06-14 09:41:02.0
Expiration Date: unknown
Title: Roadwork, NM 566 northbound and southbound at mile marker 0, Church Rock (I-40).
Description: Roadwork~~~Bridge Replacement work on NM 566, mile marker 0 - 0.866 (Church Rock). All traffic has been shifted to the detour pavement. Watch for equipment. This event will be updated as conditions change.
Post Date: 2023-10-13 15:46:41.0
Update Date: 2023-10-13 15:46:41.0
Expiration Date: unknown
Title: Roadwork, NM 81 from mile marker 0, Antelope Wells to mile marker 45, Hachita.
Description: Roadwork~~~The New Mexico Department of Transportation (NMDOT) has completed “Chip Sealing and Brooming” operations on NM 81 in and around Animas and Hachita. Crews will begin Fog Sealing operations within the next month. Speed limits will be reduced, no center stripe with loose gravel on roadway.
Post Date: 2024-07-12 14:09:53.0
Update Date: 2024-11-08 14:57:28.233
Expiration Date: unknown
Title: Closure, US 60 from mile marker 223, 5 miles east of Willard to mile marker 224, 6 miles east of Willard.
Description: Closure~~~U.S. 60 is closed in both directions due to a motor vehicle crash. Emergency services are on the scene and working to clear the crash scene as soon as possible.
Post Date: 2024-11-08 17:48:01.0
Update Date: 2024-11-08 17:48:01.0
Expiration Date: unknown
Title: Fair Driving Conditions exist in the Las Vegas area.
Description: Fair Driving Conditions - Roads are wet and may become slick.~~~This event will update as conditions change
Post Date: 2024-11-08 15:51:16.0
Update Date: 2024-11-08 17:26:16.757
Expiration Date: unknown
Title: Roadwork, US 285 northbound and southbound at mile marker 55, Lakewood.
Description: Roadwork~~~Bridge Repair operations will begin October 7, 2024 on US 285 at 55 (Lakewood). Motorists should expect both northbound and southbound inside lane closures throughout the duration of the project and working hours of 7:00 a.m. to 5:00 p.m. Monday thru Friday. Work is expected to be completed the first part of December 2024, weather permitting. Please use caution, reduce speed, and watch for all personnel and equipment in the area. Contractor: Hasse Construction; NMDOT: Contact 575-840-3035.
Post Date: 2024-10-04 13:02:06.0
Update Date: 2024-10-04 13:02:06.0
Expiration Date: unknown
Title: Roadwork, US 82 from mile marker 171 Lovington to mile marker 172, Lovington. Roadway closed.
Description: Roadwork~~~Construction for NM83/ US82/ and NM18 in the City of Lovington will take place between Milepost 71.98 to 72.13 for NM 18; between MP 171.37 to MP 172.10 US82 north; MP 171.34 to 171.37 US 82 West; and MP 0.00 to 0.48 on NM83. Commercial trucks are to use the bypasses around the city. On US82 from Tatum there is a truck bypass at MP 173. On US82 from Artesia there is a truck route at MP170 that goes to Hobbs on the right and to Tatum on the left. US82 from Texas the truck bypass is on Commercial. From Hobbs, take a left on Urlacher. The intersection of NM 83/82 has been reopened for east, west, and southbound traffic. Northbound traffic is closed from the Central to Jefferson. Use posted detour signs to navigate through construction. Obey all traffic and speed signs, and use caution while driving. Detours are set up for the road work there will be a restriction of 10 feet in width on the project. Construction for the project is scheduled to last an estimated 588 working days. Traffic Control is currently set up in Lovington. Traffic Control has been set up on US 82 Going east. Obey all traffic posting throughout the project. The intent of this project is to reconstruct existing concrete and asphalt paving, curb and gutter, ADA curb ramps, sidewalk, drive pads, storm drainage improvements, lighting, signal equipment replacement, signing, pavement markings and to provide construction traffic control for vehicles and pedestrians. Emergency Contact List for the 2101381R2 project: Contractor: Constructors, Inc., Project Manager- Darin Coslin (575) 626-1140, Superintendent- Hector Sicre (915)316-7732. Traffic Control Supervisor- Javier Cannon (915) 888-7144, Project Safety Office- Tami Mandel (505) 697-1787- Project EEO Officer- Kelly Hicks (575) 302-8408 NMDOT Project Manager John Lara (575) 840-9625, Hobbs Project Office (575) 973-0245.
Post Date: 2021-09-03 10:43:53.0
Update Date: 2024-10-03 16:12:52.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 6, 6 miles north of TX State Line to mile marker 17, 1 mile north of Malaga. Roadway closed.
Description: Roadwork~~~FNF Construction will be reconstructing the roadway, working on bridge rehab and extending drainage structures. Expect lane closures and some delays. There is a 12 foot restriction the entire corridor. WIDE LOADS SHOULD SEEK ALTERNATE ROUTE. Contact Information: FNF Project Manager - Greg Williams 480-290-0383 cell. FNF Traffic Control Supervisor - Christian Day 480-305-4872 cell. NMDOT Project Manager - Juan Salas 575-626-9882
Post Date: 2022-06-03 07:40:05.0
Update Date: 2024-07-12 10:37:42.0
Expiration Date: unknown
Title: Roadwork, I 25 at mile marker 35, (RINCON).
Description: Roadwork~~~Kimo Constructors, Inc. (Contractor) will begin work on erosion control along I-25 between Rincon and Hatch. The contractor will be working on the southbound off ramp and Rincon (exit 35) and near milepost 43, I-25 may be reduced to a single lane depending on the work location, drivers should be vigilant for construction signing. The contractor’s hours of operation are 7 a.m. to 5 p.m. Monday through Friday.
Post Date: 2024-02-02 15:08:46.0
Update Date: 2024-11-08 14:57:28.233
Expiration Date: unknown
For official NM traffic info visit: New Mexico DOT Traffic Site

Currently

Fair 40°F
30.1in
Barometer
39%
Humidity
Northwest 4.6mph
Wind
Fair

More Local Information

Bookmark and Share

Traffic Nearby

Lordsburg weather and traffic updates by locals

Write your own Lordsburg, New Mexico report, forecast, or traffic update:

Please note by clicking on "Post" you acknowledge that you have read our Privacy Policy and Terms of Service and the Lordsburg, NM report and/or forecast you are posting is in compliance with such terms. If you are under 18, do not submit this form. Be respectful. An inappropriate Lordsburg, NM report and/or forecast will be removed by a moderator.